logo
Products
PRODUCTS DETAILS
Home > Products >
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube

E155 E195 EN10305-2 Shock Absorber Welded Steel Tube

MOQ: 5Tons
Standard Packaging: Tubes are packed in wooden boxes or hexagonal bundles.
Delivery Period: 30-45 work days
Payment Method: L/C, D/A, D/P, T/T, Western Union,
Supply Capacity: 2000Tons per Year
Detail Information
Place of Origin
ZHEJIANG, CHINA
Brand Name
TORICH
Certification
ISO9001, ISO14001, TS16949
Model Number
EN10305-2
Keyword:
Welded Precision Steel Tube
Grade:
E155, E195, E235, E275, E355
OD:
15 - 200 Mm
WT:
0.8 - 16 Mm
Length:
Max 12000mm
Technique:
Cold Drawn Welded
Application:
Shock Absorber Gas Cylinder
Delivery Condition:
+C, +LC, +SC, +A, +N
Highlight:

Shock Absorber Welded Steel Tube

,

EN10305-2 Welded Steel Tube

,

E155 Automotive Steel Tubes

Product Description

TORICH Welded Precision Steel Tube EN10305-2 E235 E355

 

Quick Detail:

Product name Welded Precision Steel Tube EN10305-2 E235 E355
Steel Grade E155, E195, E235, E275, E355
Size Range OD range:15-200mm WT range: 0.8-16mm
Tolerance OD: (+/-0.06mm) WT: (+/-0.03mm)
ID surface 0.4μm
Straightness ≤0.5mm/1m
Roundness ≤0.5mm
Regular specifications 23.2X1.6, 42X3, 25.4X0.9, 15x1, 19x1.5, 20x1, 20x1.5
Delivery Condition +C, +LC, +SC, +A, +N
Standard DIN 2393, ASTM-A513-t6, EN10305, ASTM A519, GOST 5005 -82, DIN2394, JIS-G3445, DIN2391 BS6323, GOST8734-75, IS3074, ASTM A513
Application Motorcycle front fork, Motor outer shell, Automobile shock absorber cylinder, Dust cover, Automobile shock absorber reservior, refrigaretion gas reservior
Production process Material incoming inspection Surface treatment,Cold rolling Inspection,Rust preventive work,Warehouse storage
 
Standard Reference:
GB/T8713 <Precision ID seamless tubes for hydropneumatic purposes>
GB/T3639 <Cold-rolled and cold drawn precision seamless steel tubes>
EN10305-2 <Welded cold drawn tubes>
EN10305-4 <Seamless cold drawn tubes for hydraulic and pneumatic power systems>
EN10305-6 <Welded cold drawn tubes for hydraulic and pneumatic power systems>
JIS-G3445 <Carbon steel tubes for Machine Structural Purpose>
DIN2393 <Welded precision steel tubes>
 
PRODUCTION & QUALITY CONTROL
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

Application:
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube
Our Certifications:
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube
 

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

Products
PRODUCTS DETAILS
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube
MOQ: 5Tons
Standard Packaging: Tubes are packed in wooden boxes or hexagonal bundles.
Delivery Period: 30-45 work days
Payment Method: L/C, D/A, D/P, T/T, Western Union,
Supply Capacity: 2000Tons per Year
Detail Information
Place of Origin
ZHEJIANG, CHINA
Brand Name
TORICH
Certification
ISO9001, ISO14001, TS16949
Model Number
EN10305-2
Keyword:
Welded Precision Steel Tube
Grade:
E155, E195, E235, E275, E355
OD:
15 - 200 Mm
WT:
0.8 - 16 Mm
Length:
Max 12000mm
Technique:
Cold Drawn Welded
Application:
Shock Absorber Gas Cylinder
Delivery Condition:
+C, +LC, +SC, +A, +N
Minimum Order Quantity:
5Tons
Packaging Details:
Tubes are packed in wooden boxes or hexagonal bundles.
Delivery Time:
30-45 work days
Payment Terms:
L/C, D/A, D/P, T/T, Western Union,
Supply Ability:
2000Tons per Year
Highlight

Shock Absorber Welded Steel Tube

,

EN10305-2 Welded Steel Tube

,

E155 Automotive Steel Tubes

Product Description

TORICH Welded Precision Steel Tube EN10305-2 E235 E355

 

Quick Detail:

Product name Welded Precision Steel Tube EN10305-2 E235 E355
Steel Grade E155, E195, E235, E275, E355
Size Range OD range:15-200mm WT range: 0.8-16mm
Tolerance OD: (+/-0.06mm) WT: (+/-0.03mm)
ID surface 0.4μm
Straightness ≤0.5mm/1m
Roundness ≤0.5mm
Regular specifications 23.2X1.6, 42X3, 25.4X0.9, 15x1, 19x1.5, 20x1, 20x1.5
Delivery Condition +C, +LC, +SC, +A, +N
Standard DIN 2393, ASTM-A513-t6, EN10305, ASTM A519, GOST 5005 -82, DIN2394, JIS-G3445, DIN2391 BS6323, GOST8734-75, IS3074, ASTM A513
Application Motorcycle front fork, Motor outer shell, Automobile shock absorber cylinder, Dust cover, Automobile shock absorber reservior, refrigaretion gas reservior
Production process Material incoming inspection Surface treatment,Cold rolling Inspection,Rust preventive work,Warehouse storage
 
Standard Reference:
GB/T8713 <Precision ID seamless tubes for hydropneumatic purposes>
GB/T3639 <Cold-rolled and cold drawn precision seamless steel tubes>
EN10305-2 <Welded cold drawn tubes>
EN10305-4 <Seamless cold drawn tubes for hydraulic and pneumatic power systems>
EN10305-6 <Welded cold drawn tubes for hydraulic and pneumatic power systems>
JIS-G3445 <Carbon steel tubes for Machine Structural Purpose>
DIN2393 <Welded precision steel tubes>
 
PRODUCTION & QUALITY CONTROL
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

Application:
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube
Our Certifications:
E155 E195 EN10305-2 Shock Absorber Welded Steel Tube
 

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us