logo
Home > products > Precision Steel Tube >
JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

precision steel pipe

precision seamless pipe

Place of Origin:

Zhejiang, China

Brand Name:

Torich

Certification:

ISO

Model Number:

JIS 3455

Contact Us
Request A Quote
Product Details
Product Name::
JIS 3455 Hot Finished Or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes
Keywords::
Fluid Pipes
Standard::
JIS 3455
Technical::
Hot Finished Or Cold Finshed
Name:
Precision Seamless Steel Tube
Certification:
ISO
Highlight:

precision steel pipe

,

precision seamless pipe

Payment & Shipping Terms
Minimum Order Quantity
5 tons
Price
Negotiable
Packaging Details
Fluid Pipes packed in wooden boxes or hexagonal bundles in seaworthy packing.
Delivery Time
30-45 days
Payment Terms
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability
600 Ton/Tons per Month
Product Description

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes

 

Product name: JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes
Keywords: Fluid Pipes
Standard: JIS 3455
Material: STS38, STS42, STS49, STS370, STS410, STS480
OD: 10.5-660.4 mm
WT: 1.7-64.2 mm
Technical: Cold Drawn, Hot Rolled
Application: Liquid/Gas Transportation gas pipe

 

Method of manufacture

a) The pipe shall be manufactured from killed steel by the seamless process and shall be finished according to table3.

b) The pipe shall be subjected to the heat treatment specified in table 2. The heat treatment other than those specified

in table 2 shall be agreed upon by the purchaser and the manufacturer.

e)When required by the purchaser, the pipe may be furnished with a bevel end.

 

Table 1 Chemical compositions:

Designation of grade C Si Mn P S
STS 370 0.25max. 0.10 to 0.35 0.30 to 1.10 0.35max. 0.35max.
STS 410 0.30max. 0.10 to 0.35 0.30 to 1.40 0.35max. 0.35max.
STS 480 0.33max. 0.10 to 0.35 0.30 to 1.50 0.35max. 0.35max.

 

Table 2 Heat treatment:

Designation of grade Hot-finished seamless steel pipe Cold-finished seamless steel pipe
STS 370
STS 410
As manufactured. However, low temperature annealing or normalizing may be applied, as necessary. Low temperature annealed or normalized
STS 480 Low temperature annealed or normalized

 

Table 3 Designations of grade and manufacturing process:

Designation of grade Designation of manufacturing process
Manufacturing process of tubes Method of finishing Marking
STS 370 Seamless:S Hot finished: H
Cold finished: C
Marking of manufacturing method shall be as standard.
STS 410
STS 480

 

 

Product Display of JIS 3455 Pecision Seamless Steel Tubes Fluid Pipes

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes 0JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes 1

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes 2JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes 3

 

Company Introduction

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes 4

JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes 5JIS 3455 Hot Finished or Cold Finished Pecision Seamless Steel Tubes Fluid Pipes 6

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

 

3455 Seamless Non-Alloy Steel Tubes Fluid Pipes

Send your inquiry directly to us

Privacy Policy China Good Quality Precision Steel Tube Supplier. Copyright © 2015-2025 TORICH INTERNATIONAL LIMITED . All Rights Reserved.