
DIN 17175 16Mo5 Hot Rolled Heat Resistant Seamless Steel Pipe For Boiler
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 1ton | Price : | USD1000-2000/ton |
---|---|---|---|
Packaging Details : | in bundles or in wooden box | Delivery Time : | 30-45 work days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 60000 Tons Per year |
Place of Origin: | ZHEJIANG, CHINA | Brand Name: | TORICH |
---|---|---|---|
Certification: | CE,ISO | Model Number: | ASTM A192 |
Detail Information |
|||
Application: | Boiler, Heat Exchanger | Place Of Origin:: | China |
---|---|---|---|
Alloy Or Not: | Non-Alloy | OD: | 12.7-177.8mm |
WT: | 2.2-25.4mm | Length: | As Customer's Require |
Certificate: | CE,ISO | Section Shape: | Round |
High Light: | SA192 Carbon Steel Boiler Pipes,Seamless Carbon Steel Boiler Pipes,High Pressure Seamless Steel Tube |
Product Description
SA192 Carbon Steel Boiler Pipes Seamless Tubes for High-Pressure Service
Torich International Limited is a professional manufacturer and exporter of steel tubes.
It is an international marketing and sales company specialized in steel tubes, which holds the factories of Steel Tubes.
Product Introduction for Carbon Boiler Pipes :
Product name | SA192 Carbon Steel Boiler Pipes Seamless Tubes for High-Pressure Service |
Brand | TORICH |
Application | Boiler, heat exchanger |
OD | 12.7-177.8mm |
WT | 2.2-25.4mm |
Length | As customer's require |
Alloy or not Alloy | Not Alloy |
Section shape | Round |
Tolerance | ±5% |
Processing service | Bending, Punching, Cutting |
Place of origin | China |
Chemical Composition:
Carbon ,% | 0.06-0.18 |
Manganese,% | 0.27-0.63 |
Phosphorus,% | 0.035 |
Sulfur,max,% | 0.035 |
Silicon,max,% | 0.025 |
Mechanical Test:
Flattening Test |
Flaring Test |
Hardness Test |
Hydrostatic Test |
Product Show for Seamless Pipes:
Workshop for Carbon Boiler Tubes :
Certification for Seamless Pipes:
FAQ:
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-45 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
Enter Your Message