
GB/T8162 Q235 Structural Seamless Steel Tubes Thick Wall Tube For Heat Exchanger
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 1Tons | Price : | negotiable |
---|---|---|---|
Packaging Details : | woven bag or wooden box | Delivery Time : | 30-45 days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 5000tons per month |
Place of Origin: | ZheJiang,CHINA | Brand Name: | TORICH |
---|---|---|---|
Certification: | CE,ISO | Model Number: | SA179 |
Detail Information |
|||
Product Name: | SA179 Seamless Carbon Steel Boiler Tubes | Keyword: | SA179 Boiler Tubes |
---|---|---|---|
Steel Grade: | SA179,1010,1020 | Application: | Boiler And Heat Exchanger |
Type: | Cold-drawn | Whether Alloy: | Non-Alloy |
WT: | 0.5-50mm | OD: | 3.2-76.2mm |
High Light: | Carbon Seamless Boiler Tubes,SA179 Seamless Boiler Tubes,Cold Drawn Heat Exchanger Tubes 50mm |
Product Description
SA179 BGW14 Carbon Seamless Boiler Tubes
Torich International Limited is a professional manufacturer and exporter of steel pipes materials.
It is an international marketing and sales company specialized in steel tubes, which holds the factories of Carbon Steel Boilers Tubes
Applications:
for Boilers, Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Heat Treatment:
Tubes are heat treated after the final cold draw pass at a temperature of 1200℉(650℃) or higher
Surface Finish:
Finish Tubes are free of scale.
We have normal heat treatment annealing with black surface.
Have bright annealing with grey and bright surface.
Mechanical Testing:
Flattening Test
Flaring Test
Flange Test
Hardness Test
Chemical Composition
Material | C | Mn | P | S |
A179 | 0.06-0.18 | 0.27-0.63 | 0.035max | 0.035max |
Mechanical Property
Material | Tensile Strength,Mpa | Yield Strength,Mpa | Elongation/% |
A179 | Min 415 | Min 205 | Max 20 |
Good concentricityCharacteristic:
Good OD and ID tolerance
High Precision
Stable Quality
TORICH QUALITY ASSURANCE
Product Show for SA179 Boiler Tubes
production process for SA179 Boiler Tubes
FAQ:
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-45 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
Enter Your Message