316 Stainless Steel Quilted Grinding Hydraulic Cylinder Pipe
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5Tons | Packaging Details : | Tubes are packed in wooden boxes or hexagonal bundles. |
---|---|---|---|
Delivery Time : | 30-45 work days | Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 2000Tons per Year |
Place of Origin: | ZHEJIANG, CHINA | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO9001, ISO14001, TS16949 | Model Number: | EN10305-1 |
Detail Information |
|||
Keyword: | BKS Honed Steel Tube | Grade: | ST35 ST37 ST52 E235 E355 |
---|---|---|---|
OD: | 15 - 200 Mm | WT: | 0.8 - 16 Mm |
Length: | Max 12000mm | Technique: | Cold Drawn Seamless |
Application: | Shock Absorber Gas Cylinder | Delivery Condition: | +C, +LC, +SC, +A, +N |
High Light: | CK45 Shock Absorber Seamless Pipe,BKS Honed Steel Tube,CK45 Shock Absorber Honed Steel Tube |
Product Description
Manufacture Method:
Cold drawn, hot rolled+deep hole bored
Certification:
ISO9001, SGS,
Standard&Grade:
DIN2391-2 ST52,EN10305-1 E355,C45E,25CrMo4,42CrMo4, CK45,E410, E470,ASTM A519 SAE1020,SAE1026,SAE1045,SAE1518,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,etc.
ID Tolerance:
ISO H8
End finish:
Plain ends with square cuts,free of burrs
Bore Roughness:
Ra0.30um max for honed tubes, Ra0.25um Max for Skived&roller burnished tubes
End finish:
Plain ends with square cuts,free of burrs
Usage:
Hydraulic cylinder, Pneumatic Cylinder
Product Feature:
1.High precision (can cut the costs of machining) .
2.Excellent surface finish
3.Good mechanical performance (Aneal ,Bright Anealing,QT heatment on steel tubes to reach customers' Mechanical requsts. )
1.+C /BK
No heat treatment after final cold drawing process.
2.+LC/BKW
After the final heat treatment there's a suitable drawing pass.
3.+SA/BKS
After the final cold drawing process there's a stress relief heat treatment in controlled atmosphere.
4.+A/GBK
After the cold drawing process the tubes are annealed in a controlled atmosphere.
5.+N/NBK
After the final cold drawing operation the tubes are normalized in a controlled atmosphere
FAQ:
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Enter Your Message