logo
Welcome to TORICH INTERNATIONAL LIMITED
+86-13736164628

Precision Seamless Steel Tube Hydraulic Cylinder E355 E235 Pipe Din2391 En10305-1

Basic Properties
Place of Origin: China
Brand Name: TORICH
Certification: ISO,CE
Model Number: DIN2391-1
Trading Properties
Minimum Order Quantity: 1 Ton
Price: Negotiated
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 25000 tons/year
Product Summary
Precision Seamless Steel Tube Hydraulic Cylinder E355 E235 Pipe Din2391 En10305-1 TORICH,located in Ningbo, has more than 20 years hisory in EN10305-1,DIN2391 precision steel tube industry with much experience in export 1.Details of precision seamless steel tube: OD:4-76mm Wall thickness:0.5-8mm ...

Product Details

Highlight:

Din2391 Hydraulic Cylinder Honed Tube

,

En10305-1 Hydraulic Cylinder Honed Tube

,

Carbon Steel Hydraulic Cylinder Honed Tube

Product Name: Precision Seamless Steel Tube Hydraulic Cylinder E355 E235 Pipe Din2391 En10305-1
Keyword: Precision Cold Drawn Steel Tube
OD: 6-130mm
WT: 1-25mm
Length: 5800-12000
Standard: Din2391 EN10305-1
Shape: Round
Usage: Hydraulic Cylinder
Brand: TORICH
Surface Finish: Oiled
Product Description

Precision Seamless Steel Tube Hydraulic Cylinder E355 E235 Pipe Din2391 En10305-1

 

TORICH,located in Ningbo, has more than 20 years hisory in EN10305-1,DIN2391 precision steel tube industry with much experience in export 

 

1.Details of precision seamless steel tube:

OD:4-76mm

Wall thickness:0.5-8mm

Material:E215 E235 E355 ST35,ST37.4,ST45,ST52.4 etc

2.Equivalent standard:

 Precision steel tube
Standard  Material Delivery Surface Sizes
DIN 2391/1630/2445 ST37.4 ST52.4 NBK

1) BA

2) 2)Black phosphating 3) Galvanizing

OD 2 -60mm × WT0.3 -10mm
EN 10305-4 E235 E355 (+)N  
BS 3602 CFS 360   Zinc Layer thickness more than 8um
Other steel grades also available upon request

 

3.Delivery condition:

The tubes can be produced in the following delivery conditions:

BK (+C) Cold finished/hard (cold finished as drawn).

No heat treatment after the last cold forming process.

 

BKW (+LC) Cold finished/soft (lightly cold worked)

After the last heat treatment there is a light finishing pass (cold drawing).

 

BKS (+SR) Cold finished/stress relieve annealed.

After the final cold forming process the tubes are stress relieve annealed.

 

GBK (+A) Annealed.

After the final cold forming process the tubes are annealed in a controlled atmosphere.

 

NBK (+N) Normalized. (Mainly focus on)

After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere

 

4.Main feature of DIN2391 precision seamless steel tube:
High precision
Excellent brightness
No oxidization on outer and inner walls after heat treatment
High cleanness of inside wall
High pressure
No deformation after clod bending
No crack after flaring and flattening
Color : Gray with white


5.Product show after production:

Precision Seamless Steel Tube Hydraulic Cylinder E355 E235 Pipe Din2391 En10305-1 0Precision Seamless Steel Tube Hydraulic Cylinder E355 E235 Pipe Din2391 En10305-1 1

 

QUALITY CONTROL:

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

6. FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

 

Related Products
  • Auto Parts ASTM A513 Cold Rolling Welded Steel Tubes with DOM Production

    Auto Parts ASTM A513 Welded Steel Tubes with DOM production ASTM A513 Electric-Resistance-Welded Carbon and Alloy Steel Mechanical Tubing Applications: for Machinery, Mechanical Engineering 1. Standard: ASTM A513 cold rolling welded precision steel tubes 2. Steel Grade: SAE1010, SAE1020, other materials upon agreement with customers. 3. Production method: Cold rolling on the weled steel tubes, to reach high accuracy on the OD and WT tolerance 4. Size range: O.D.:6-350mm W.T.
  • 25mm Diameter Bright Annealing Seamless Steel Tube for Hydraulic Systems

    EN10305-1 E235 E355 NBK Bright Annealing Precision Steel Pipes for Hydraulic Systems EN10305-1 NBK Bright Annealed Precision steel pipes for Hydraulic system OD:4-80 (mm) WT0.5-10 (mm) Length 1000-12000mm Product name: Seamless Precision Steel Pipe Application: for hydraulic systems precision steel pipes for Hydraulic system OD (mm) WT (mm) Length (mm) 4 0.5 5800-6000 4.0 1.0 5800-6000 5.0 1.0 5800-6000 6.0 1.0 5800-6000 6.0 1.5 5800-6000 8.0 1.0 5800-6000 9.5 0.89 5800-6000
  • Precision Seamless Black Phosphating Steel Tube for Hydraulic Systems

    Steel Pipes with high precision for Hydraulic Systems with Black Phosphating surface Black Phosphated Hydraulic Tubes with High Precision and tight tolerance, the tubes are produced by precision cold drawn and cold rolling, then bright annealed in a protected atmosphere, afterwards it is blackphosphated on the surface Production process: DIN series tubes, cold drawn and bright annealed precision seamless steel tube is used as the tube to be phosphated. The phosphorization is
  • Precision Seamless Galvanized Steel Tubes DIN2391 EN103052 ST35.0 ST37

    Precision Seamless Galvanized Steel Tubes DIN2391 EN103052 ST35.0 ST37 Production Process: Cold rolling by Cold pilger machine and Cold rolling machine,galvanized and zinc plated could be applied. Cold Rolled and Galvanized Steel Tube Production process: DIN highly accurate, cold rolled and bright seamless steel tube is used as the tube to be galvanized. The outer wall of tube is electroplated. The caps are covered at two ends of tube to prevent from the dust. Main Features:

Send An Inquiry