Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

Steel Pipe DIN2391 Tubos Sin Costura Hydraulic Seamless Steel Tubes Galvanized

Minimum Order Quantity : 5 tons Price : Negotiable
Packaging Details : in bundles with seaworthy packing Delivery Time : 45-60 days
Payment Terms : T/T, L/C, D/A, D/P, Western Union, MoneyGram Supply Ability : 6000 ton/year
Place of Origin: CHINA Brand Name: TORICH
Model Number: DIN2391

Detail Information

Certification: ISO9001, TS16949 Product Name: Steel Pipe DIN2391 Tubos Sin Costura Hydraulic Seamless Steel Tubes Galvanized
Standard: DIN2391 Technique: Cold Drawn, Cold Rolled
Section Shape: Round Alloy Or Not: Non-alloy
Secondary Or Not: Non-secondary Special Tube: Precision Seamless Steel Tube

Product Description

 Steel Pipe DIN2391 Tubos Sin Costura Hydraulic Seamless Steel Tubes Galvanized

 

Standard: DIN2391

Technique: Cold Drawn, Cold Rolled.

Size range: OD: 4-76mm, WT:0.5-8mm, Length: ≤12m, or at buyer's request.

Material: ST35,ST37.4,ST45,ST52.4 etc

Surface Customization: NBK, Galvanization/Galvanized/Zinc Coated, Blue White Zinc (Trivalent Chromium Passivation),

Plating Colour Zinc(Trivalent Chromium Passivation), Yellow, Army-Green, Phosphated/Black Phosphated.

Production Routing:Quality carbon steel from bao steel etc big mill, cold drawing the heat treatment without oxidization,

NBK condition. Do nondestructive testing ,HT tests and do dipping oil antirust protection, Packed tube in wooden boxes.

 

Delivery Condition: BK(+C), BKW(+LC), BKS(+SR), GBK(+A),NBK( +N)

BK (+C) Cold finished/hard

No heat treatment after the last cold forming process.

BKW (+LC) Cold finished/soft

After the last heat treatment there is a light finishing pass (cold drawing).

BKS (+SR) Cold finished/stress relieve annealed.

After the final cold forming process the tubes are stress relieve annealed.

GBK (+A) Annealed.

After the final cold forming process the tubes are annealed in a controlled atmosphere.

NBK (+N) Normalized.

After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere

 

What We Can Do in Our Testing Center:

Physis laboratory, Chemical spectrometer, Pressure blasting machine, Metallographic analysis, Salt Spray Test

 

Quality Control:

1. Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects

 

Product Display of Hydraulic Seamless Steel Tubes

Hydraulic Seamless Steel Tubes Hydraulic Seamless Steel Tubes

Hydraulic Seamless Steel Tubes  Hydraulic Seamless Steel Tubes

 

Packing & Delivery

Packing Details : In bundles or in wooden boxes packaging

DIN2391 St35 NBK Cold Drawn Seamless Steel Tube 14x3mm for Engineering Machinery Industry 2 DIN2391 St35 NBK Cold Drawn Seamless Steel Tube 14x3mm for Engineering Machinery Industry 3

 

Our Certifications

DIN2391 St35 NBK Cold Drawn Seamless Steel Tube 14x3mm for Engineering Machinery Industry 4

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


If you have another question, pls feel free to contact us.

You Might Be Into These
Get in touch with us

Enter Your Message

sales6@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628