ASTM A519 1035 Seamless Carbon And Alloy Steel Mechanical Tubing For Hydraulic
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Detail Information |
|||
Product Name: | EN10305-1 Galvanized Steel Tube With High Precision | Standard: | EN10305-1 |
---|---|---|---|
Technique: | Cold Drawn | Surface Treatment: | Oiled |
Type: | Seamless | Alloy Or Not: | Non-alloy |
Section Shape: | Round | Tolerance: | ±3%, ±5% |
Brand: | Torich | Place Of Origin: | Zhejiang,China |
High Light: | 10mm carbon steel seamless tubing,SAE 1020 carbon steel seamless tubing,TORICH carbon steel seamless tubing |
Product Description
EN10305-1 E215 E235 E355 Galvanized Steel Tube with High Precision
EN10305-1 tubes are produced by seamless cold drawn, and bright annealed in a controlled atmosphere furnace to keep the surface quality bright and smooth, then galvanized coating the surface.
Sault spray test will be carried out if a report is needed!
Quick Detail:
DIN2391 St37.4 Galvanized Steel Tube with High Precision
E215, E235, E355,
Steel Grade and Chemical Compositions:
Steel Grade | C | Si | Mn | P | S |
max | max | max | max | ||
ST35 | 0.17 | 0.35 | ≥0.40 | 0.025 | 0.025 |
ST45 | 0.21 | 0.35 | ≥0.40 | 0.025 | 0.025 |
ST52 | 0.22 | 0.35 | ≥1.60 | 0.025 | 0.025 |
Steel Grade |
C max |
Si max |
Mn max |
P max |
S max |
Al min |
|
Steel Name | Steel Number | ||||||
E215 | 1.0212 | 0.10 | 0.05 | 0.70 | 0.025 | 0.025 | 0.025 |
E235 | 1.0308 | 0.17 | 0.35 | 1.20 | 0.025 | 0.025 | - |
E355 | 1.0580 | 0.22 | 0.55 | 1.60 | 0.025 | 0.025 | - |
Production process:
Product Pictures:
Company Introduction:
Packaging and Delivery:
FAQ:
Q: Are you trading company or manufacturer?
A: We are a professional steel pipes materials manufacturer.
Q: How long is your delivery time?
A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.
Q: Do you provide free sampleas?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Enter Your Message