Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

AISI 1045 GB 45# DIN C45 CK45 1.0503 Hard Chromed Piston Rod

Minimum Order Quantity : 1 Ton Price : USD 1500-2000 Per Ton
Packaging Details : In hexagonal bundles or wooden box Delivery Time : 30-45days
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 6000 Tons Per Year
Place of Origin: zhejiang, China Brand Name: Torich
Certification: ISO Model Number: CK45 1045

Detail Information

Product Name: AISI 1045 GB 45# DIN C45 CK45 1.0503 Hard Chromed Piston Rod Model No: CK45 1045
Technique: Cold Drawn Surface Treatment: Oiled
Section Shape: Round Diameter(round): 6-500mm
Secondary Or Not: Non-secondary Length: According To Customers Requirement
Type: Mold Steel Usage: Structural Steel Bar
High Light:

1045 Piston Rod

,

CK45 Piston Rod

,

Hard Chromed Piston Rod

Product Description

AISI 1045 GB 45# DIN C45 CK45 1.0503 Hard Chromed Piston Rod

 

Quick overview:

 

Material: CK45, SAE1045, 4140, 4340, JIS45C, 40Cr, 42CrMo

Diameter: Φ 6-500 mm

Length: max 16m

Chrome layer: 20 micron (min)

Hardness of the chrome layer: 800HV-1150HV

Roughness: Ra ≤0.2u

Straightness: ≤ 0.2/1000

Diameter tolerance: ISO f7

Roundness: the deviation of roundness is 50% of the diameter tolerance at the most.

Supply condition: Hard chrome plated/ Hardened and tempered/ Induction hardened

Packing: Anti rust oil to be spread on rod surface and each rod to be packed in paper roll and then in wooden case.

 

Product name piston rod
Size Φ 6-500 mm
Material 20#,45#,40Cr,46CrMo4 or as required
Technique cold drown/peeling
Tolerance ISO f7
Chrome layer thickness 15-30μm
Leeb hardness 20-60HRC
Application cylinder tube

 

Product Pictures of Piston Rod

AISI 1045 GB 45# DIN C45 CK45 1.0503 Hard Chromed Piston RodAISI 1045 GB 45# DIN C45 CK45 1.0503 Hard Chromed Piston Rod

 

Company Introduction

AISI 1045 GB 45#  DIN C45  CK45 1.0503 Hard Chromed Piston Rod 2

Manufacturing Process
JIS G3445 STKM13C NBK BKS Carbon Steel Seamless Hydraulic Honed Tubes 2

Packing & Delivery

Packing Details : In bundles or in wooden boxes packaging

1.Coated by antirust oil.
2.Sheathed by paper carton tube, both end covered by roundness paper carton.
3. Cotton rope twined and bundled without interspace, to avoid any surfaced scratched.
4. Plastic film covered overall of bundled bars, to keep seal.
5. (Options) Woven tarpaulin covered overall of bundled bars, to keep packing clear.
6. Lifting belts on the middle of bundled bars.
7. (Options) Wooden box packed.

DIN2391 St35 NBK Cold Drawn Seamless Steel Tube 14x3mm for Engineering Machinery Industry 2DIN2391 St35 NBK Cold Drawn Seamless Steel Tube 14x3mm for Engineering Machinery Industry 3

 

Our Certifications

DIN2391 St35 NBK Cold Drawn Seamless Steel Tube 14x3mm for Engineering Machinery Industry 4

Quality control

1. Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


If you have another question, pls feel free to contact us.

You Might Be Into These
Get in touch with us

Enter Your Message

sales6@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628