logo
Products
PRODUCTS DETAILS
Home > Products >
Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

MOQ: 1 Ton
Standard Packaging: Paint oil on the surface ;Bundle packing by Iron Strips.
Delivery Period: 4-6 Weeks
Payment Method: L/C, D/A, D/P, T/T, Western Union,
Supply Capacity: 5000 Tons Per Year
Detail Information
Place of Origin
ZHEJIANG
Brand Name
TORICH
Certification
ISO
Model Number
30 - 250 mm
Thickness:
2 - 30mm
Outer Diameter:
30 - 250 Mm
Application:
Hydraulic Pipe
Grade:
10#-45#, 16mn, Q195-Q345, ST35-ST52
Alloy Or Not:
Non-alloy
Surface:
Customers't Requirement
Highlight:

OD 250mm Carbon Steel Tube

,

Q345 Carbon Steel Tube

,

Cold Drawn Steel Hydraulic Tubing

Product Description

 

Cold Drawn Precision Round Carbon Steel Tube

 

 

Mechanics performance:
Material Tensile strength Yield strength Elongation Hardness
CK20/20#/AISI1020 >520 N/ mm2 >375 N/mm2 >15% >85HB
CK45/45#/AISI1045 >600 N/ mm2 >520 N/ mm2 >15% >85HB
ST52/16Mn/Q345D >600 N/ mm2 >520 N/ mm2 >15% >85HB
25Mn/STKM 13C-T >600 N/ mm2 >530 N/ mm2 >15% >85HB

 

 

Variety :
Processing Cylinder
Diameter
Straightness Size
Accuracy
W.T/mm Inner Bore Roughess
Cold drawn/cold rolled ID30-250 0.3 H9-H11 ±10% 0.4~1.6um
Honed tube ID50-250 0.3 H7-H9 ±10% <0.4um

 

 

Condition Material Grade T.S (MPa) lowest Y.S (MPa) lowest Elongation (%)
BKS ST35 (10#) ≥420 ≥315 ≥14
BKS ST45(20#) ≥520 ≥375 ≥12
BKS ST52(16Mn) ≥580 ≥420 ≥10
GBK ST35 (10#) ≥315   ≥35
GBK ST45(20#) ≥390   ≥32
GBK ST52(16Mn) ≥490   ≥30
NBK ST35 (10#) 340-470 ≥235 ≥32
NBK ST45(20#) 440-570 ≥255 ≥30
NBK ST52(16Mn) 490-630 ≥335 ≥28

 

 

 

 

Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

 

Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

 

Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

 

1.Transportation: By Sea

20' FCL (means the length than 5,800mm)
40' FCL (means the length than 11,800mm)
2.Bulk cargo (means the quantity is more than 200MT)
3.With regards to other length or quantity, it should be taken by clients themselves
4.Delivery time: 25-35days to the dispatch port after receipt of T/T or L/C at sight.
5.Optional: wooden box; caps; vanished coating.
6.Payment: T/T or L/C at sight, T/T 100% in advance (If order less than 3MT)
7.Price item: FOB, CFR, CNF, C&F, CIF
8.Origin: China
9.Third party inspection: BV, SGS, Lloyds. The Expense needs to stand by clients.

 

 

1.Are you a trading company or manufacturer?

We are the professional manufacturer of precision seamless steel pipe since the year 1992.

 

2. How can I get the price?

We usually quote within 24 hours after we get your inquiry by telling us the material, out diameter,

wall thickness length, quantity and application of the steel pipe which you need.

If you are very urgent to get the price.

please inform us in email so that we will regard your inquiry priority.

 

3. How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. we will provide you

the sample for free, however we could only make sure the same material, the dimension will be

much similar as your request but not same.

And customer should afford the charge of shipment.

 

4. What about the lead time for mass production?

Honestly, it depends on the order quantity and the season you place the order.

if normal order 25-30days.

 

5. What is your terms of delivery?
We accept FOB CIF EXW CFR.

 

 

 

 

 

 

Products
PRODUCTS DETAILS
Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube
MOQ: 1 Ton
Standard Packaging: Paint oil on the surface ;Bundle packing by Iron Strips.
Delivery Period: 4-6 Weeks
Payment Method: L/C, D/A, D/P, T/T, Western Union,
Supply Capacity: 5000 Tons Per Year
Detail Information
Place of Origin
ZHEJIANG
Brand Name
TORICH
Certification
ISO
Model Number
30 - 250 mm
Thickness:
2 - 30mm
Outer Diameter:
30 - 250 Mm
Application:
Hydraulic Pipe
Grade:
10#-45#, 16mn, Q195-Q345, ST35-ST52
Alloy Or Not:
Non-alloy
Surface:
Customers't Requirement
Minimum Order Quantity:
1 Ton
Packaging Details:
Paint oil on the surface ;Bundle packing by Iron Strips.
Delivery Time:
4-6 Weeks
Payment Terms:
L/C, D/A, D/P, T/T, Western Union,
Supply Ability:
5000 Tons Per Year
Highlight

OD 250mm Carbon Steel Tube

,

Q345 Carbon Steel Tube

,

Cold Drawn Steel Hydraulic Tubing

Product Description

 

Cold Drawn Precision Round Carbon Steel Tube

 

 

Mechanics performance:
Material Tensile strength Yield strength Elongation Hardness
CK20/20#/AISI1020 >520 N/ mm2 >375 N/mm2 >15% >85HB
CK45/45#/AISI1045 >600 N/ mm2 >520 N/ mm2 >15% >85HB
ST52/16Mn/Q345D >600 N/ mm2 >520 N/ mm2 >15% >85HB
25Mn/STKM 13C-T >600 N/ mm2 >530 N/ mm2 >15% >85HB

 

 

Variety :
Processing Cylinder
Diameter
Straightness Size
Accuracy
W.T/mm Inner Bore Roughess
Cold drawn/cold rolled ID30-250 0.3 H9-H11 ±10% 0.4~1.6um
Honed tube ID50-250 0.3 H7-H9 ±10% <0.4um

 

 

Condition Material Grade T.S (MPa) lowest Y.S (MPa) lowest Elongation (%)
BKS ST35 (10#) ≥420 ≥315 ≥14
BKS ST45(20#) ≥520 ≥375 ≥12
BKS ST52(16Mn) ≥580 ≥420 ≥10
GBK ST35 (10#) ≥315   ≥35
GBK ST45(20#) ≥390   ≥32
GBK ST52(16Mn) ≥490   ≥30
NBK ST35 (10#) 340-470 ≥235 ≥32
NBK ST45(20#) 440-570 ≥255 ≥30
NBK ST52(16Mn) 490-630 ≥335 ≥28

 

 

 

 

Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

 

Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

 

Hydraulic Cold Drawn Q345 OD 250mm Carbon Steel Tube

 

1.Transportation: By Sea

20' FCL (means the length than 5,800mm)
40' FCL (means the length than 11,800mm)
2.Bulk cargo (means the quantity is more than 200MT)
3.With regards to other length or quantity, it should be taken by clients themselves
4.Delivery time: 25-35days to the dispatch port after receipt of T/T or L/C at sight.
5.Optional: wooden box; caps; vanished coating.
6.Payment: T/T or L/C at sight, T/T 100% in advance (If order less than 3MT)
7.Price item: FOB, CFR, CNF, C&F, CIF
8.Origin: China
9.Third party inspection: BV, SGS, Lloyds. The Expense needs to stand by clients.

 

 

1.Are you a trading company or manufacturer?

We are the professional manufacturer of precision seamless steel pipe since the year 1992.

 

2. How can I get the price?

We usually quote within 24 hours after we get your inquiry by telling us the material, out diameter,

wall thickness length, quantity and application of the steel pipe which you need.

If you are very urgent to get the price.

please inform us in email so that we will regard your inquiry priority.

 

3. How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. we will provide you

the sample for free, however we could only make sure the same material, the dimension will be

much similar as your request but not same.

And customer should afford the charge of shipment.

 

4. What about the lead time for mass production?

Honestly, it depends on the order quantity and the season you place the order.

if normal order 25-30days.

 

5. What is your terms of delivery?
We accept FOB CIF EXW CFR.