ERW 3PE FBE Epoxy Plastic Coated Spiral Steel Pipe
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5 Tons | Price : | USD 800-1200/Ton |
---|---|---|---|
Packaging Details : | In plywood case, In wooden box. | Delivery Time : | 30-45 days after order confirmed |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 60000 Ton per year |
Place of Origin: | China | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO 9001 ISO14001 TS16949 | Model Number: | ASTM A500 |
Detail Information |
|||
Products Name: | ASTM A500 Structural Round Tubing | Production Method: | Seamless Or Welded |
---|---|---|---|
End Protector: | Plain / Beveled | Type: | Seamless Steel Square Rectangle Tube |
Material: | 1010, 1020 Etc | Package: | In Bundles Or As Per Requests |
MTC: | EN10204.3.1 | Grade: | A, B, C, Or D |
Surface Treatment: | Normally Bare Or Black Vanish | Characteristic: | Square Steel Tube |
High Light: | ASTM A500 Structural Steel Pipe,1010 Structural Steel Pipe,12m Structural Steel Square Tubing |
Product Description
ASTM A500 Cold -Formed Welded and Seamless Carbon Structural Tubing
Product Description:
This specification covers cold-formed welded and seamless carbon steel round, square, rectangular, or special shape structural tubing for welded, riveted, or bolted construction of bridges and buildings, and for general structural purposes. This tubing shall be produced in both welded and seamless sizes and must have the chemical requirements of carbon, manganese, phosphorus, sulfur, and copper. The steel shall be produced by either open-hearth, basic-oxygen, or electric-furnace melting process. When steels of different grades are sequentially strand cast, the steel producer shall identify the resultant transition material and remove it using an established procedure that positively separates the grades. The tubing shall then be made by a seamless or welding process. Welded tubing shall be made from flat-rolled steel by the electric-resistance-welding process. The longitudinal butt joint of welded tubing shall be welded across its thickness in such a manner that the structural design strength of the tubing section is assured. Tension test and flattening test shall be conducted to the specimens. All tubing shall be inspected at the place of manufacture to ensure conformance to the requirements of this specification and must have a workmanlike finish that is free from defects.
Size Range:
|
O.D(mm) | W.T.(mm) | L(mm) |
Square tubes
|
5-420 | 0.5-50 | max12000 |
Rectangle tubes |
20-30 to 400-600 | 1-24 | max12000 |
Steel Grade and Chemical Compositions:
Steel grade | Minimum values for the delivery conditionab | ||||||||||||
+CC | +LCC | +SR | +Ad | +N | |||||||||
steel name | steel number | Rm MPa | A % | Rm MPa | A % | Rm Mpa | ReH MPa | A % | Rm MPa | A % | Rm MPa | ReHC MPa | A % |
E155 | 1.0033 | 400 | 6 | 350 | 10 | 350 | 245 | 18 | 260 | 28 | 270 to 410 | 155 | 28 |
E195 | 1.0034 | 420 | 6 | 370 | 10 | 370 | 260 | 18 | 290 | 28 | 300 to 440 | 195 | 28 |
E235 | 1.0908 | 490 | 6 | 440 | 10 | 440 | 325 | 14 | 315 | 25 | 340 to 480 | 235 | 25 |
E275 | 1.0225 | 560 | 5 | 510 | 8 | 510 | 375 | 12 | 390 | 21 | 410 to 550 | 275 | 21 |
E355 | 1.0580 | 640 | 4 | 590 | 6 | 590 | 435 | 10 | 450 | 22 | 490 to 630 | 355 | 22 |
a. Rm: tensile strength ; ReH: upper yield strength (but see 11.1); A: elongation. For symbols for the delivery condition see Table 1. | |||||||||||||
b. 1 Mpa = 1 N/mm2 | |||||||||||||
c. Depending on the degree of cold work in the finishing pass the yield strength may nearly be as high as the tensile strengths. For calculation purposes the following relations are recommended: | |||||||||||||
—— For delivery condition +C: ReH ≥0.8 Rm | |||||||||||||
—— For delivery condition +LC: ReH ≥0.7 Rm | |||||||||||||
d. For calculation purposes the following relations is recommended: ReH ≥0.5 Rm | |||||||||||||
e. For tubes with outside diameter ≤ 30 mm and wall thickness≤ 3mm, the ReH minimum values are 10 Mpa lower than the values given in this Table. |
Applications:
for construction of bridges, and buildings, and for general strcutrual purposes,
For Algricultrual Michinery, Engineering etc.
Keywords:
Bolted Construction - Bolting And Riveting - Bridges - Building Construction - Building Design And Construction - Carbon Steel - Cold Forming - Forming - Riveted Construction - Seamless Pipes And Tubes - Seamless Steel Tubes - Welded Pipes And Tubes - Welded Steel Tubes - Welding
ASTM A500 Cold -Formed Welded and Seamless Carbon Structural Tubing
Packing:
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
ASTM A500 Cold -Formed Welded and Seamless Carbon Structural Tubing
Enter Your Message