Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

Condenser Titanium ASTM B338 Alloy Steel Pipe

Minimum Order Quantity : 1 tons Packaging Details : Packing in cartons
Delivery Time : 25-30 days Payment Terms : L/C, D/A, D/P, T/T, Western Union, Western Union, MoneyGram
Supply Ability : 50 tons per month
Place of Origin: China Brand Name: Torich
Certification: CE,ISO Model Number: GB/T3624

Detail Information

Name: Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes Standard: GB/T 3625, GB/T 3624,ASTM B338
Type: Alloy Grade: TA1、TA1ELI、TA2、TA2ELI、TA9、TA10
Usage: Heat Exchanger, Condenser Section Shape: Round
High Light:

alloy steel tube

,

alloy steel seamless tube

Product Description

Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes

 

 

Brief introduction:

Name GB/T 3624 Titanium Alloy Heat Exchanger Tubes
Standard GB/T 3625, GB/T 3624,ASTM B338 ,ASTM B861 ,ASTM 4942 ,JIS H4630,JIS H4631,JIS H4635,DIN 17861,DIN 17866,GOST 24890, GOST 21945 ,GOST 22897 
Grade TA1,TA1ELI,TA2,TA2ELI,TA9,TA10
Type Alloy
Usage Heat exchanger, condenser
Size range Φ(3-159)×(0.2-6.0) ×L Condition: Hot rolled
Φ(25-210)×(3.0-6.0) ×L Condition: Cold Rolled

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

Product show:

Condenser Titanium ASTM B338 Alloy Steel Pipe 0

 

Condenser Titanium ASTM B338 Alloy Steel Pipe 1Condenser Titanium ASTM B338 Alloy Steel Pipe 2

Q&A

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

 

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

 

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

 

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

 

 

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
 
Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.
 
Q: How is your production capability?
A: 1. 2000 tons monthly production capacity, 5000 tons monthly trading capability
2. Prompt and Timely shipment
 
Q:How to get the sample?
A:1. You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2. Sample charges will be refunded when order is placed.
 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

You Might Be Into These
Get in touch with us

Enter Your Message

sales3@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628