logo
Welcome to TORICH INTERNATIONAL LIMITED
+86-13736164628

Condenser Titanium ASTM B338 Alloy Steel Pipe

Basic Properties
Place of Origin: China
Brand Name: Torich
Certification: CE,ISO
Model Number: GB/T3624
Trading Properties
Minimum Order Quantity: 1 tons
Payment Terms: L/C, D/A, D/P, T/T, Western Union, Western Union, MoneyGram
Supply Ability: 50 tons per month
Product Summary
Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes Brief introduction: Name GB/T 3624 Titanium Alloy Heat Exchanger Tubes Standard GB/T 3625, GB/T 3624,ASTM B338 ,ASTM B861 ,ASTM 4942 ,JIS H4630,JIS H4631,JIS H4635,DIN 17861,DIN 17866,GOST 24890, GOST 21945 ,GOST 22897  Grade TA1...

Product Details

Highlight:

alloy steel tube

,

alloy steel seamless tube

Name: Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes
Standard: GB/T 3625, GB/T 3624,ASTM B338
Type: Alloy
Grade: TA1、TA1ELI、TA2、TA2ELI、TA9、TA10
Usage: Heat Exchanger, Condenser
Section Shape: Round
Product Description

Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes

 

 

Brief introduction:

Name GB/T 3624 Titanium Alloy Heat Exchanger Tubes
Standard GB/T 3625, GB/T 3624,ASTM B338 ,ASTM B861 ,ASTM 4942 ,JIS H4630,JIS H4631,JIS H4635,DIN 17861,DIN 17866,GOST 24890, GOST 21945 ,GOST 22897 
Grade TA1,TA1ELI,TA2,TA2ELI,TA9,TA10
Type Alloy
Usage Heat exchanger, condenser
Size range Φ(3-159)×(0.2-6.0) ×L Condition: Hot rolled
Φ(25-210)×(3.0-6.0) ×L Condition: Cold Rolled

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

Product show:

Condenser Titanium ASTM B338 Alloy Steel Pipe 0

 

Condenser Titanium ASTM B338 Alloy Steel Pipe 1Condenser Titanium ASTM B338 Alloy Steel Pipe 2

Q&A

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

 

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

 

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

 

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

 

 

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
 
Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.
 
Q: How is your production capability?
A: 1. 2000 tons monthly production capacity, 5000 tons monthly trading capability
2. Prompt and Timely shipment
 
Q:How to get the sample?
A:1. You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2. Sample charges will be refunded when order is placed.
 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

Related Products
  • Auto Parts ASTM A513 Cold Rolling Welded Steel Tubes with DOM Production

    Auto Parts ASTM A513 Welded Steel Tubes with DOM production ASTM A513 Electric-Resistance-Welded Carbon and Alloy Steel Mechanical Tubing Applications: for Machinery, Mechanical Engineering 1. Standard: ASTM A513 cold rolling welded precision steel tubes 2. Steel Grade: SAE1010, SAE1020, other materials upon agreement with customers. 3. Production method: Cold rolling on the weled steel tubes, to reach high accuracy on the OD and WT tolerance 4. Size range: O.D.:6-350mm W.T.
  • 25mm Diameter Bright Annealing Seamless Steel Tube for Hydraulic Systems

    EN10305-1 E235 E355 NBK Bright Annealing Precision Steel Pipes for Hydraulic Systems EN10305-1 NBK Bright Annealed Precision steel pipes for Hydraulic system OD:4-80 (mm) WT0.5-10 (mm) Length 1000-12000mm Product name: Seamless Precision Steel Pipe Application: for hydraulic systems precision steel pipes for Hydraulic system OD (mm) WT (mm) Length (mm) 4 0.5 5800-6000 4.0 1.0 5800-6000 5.0 1.0 5800-6000 6.0 1.0 5800-6000 6.0 1.5 5800-6000 8.0 1.0 5800-6000 9.5 0.89 5800-6000
  • Precision Seamless Black Phosphating Steel Tube for Hydraulic Systems

    Steel Pipes with high precision for Hydraulic Systems with Black Phosphating surface Black Phosphated Hydraulic Tubes with High Precision and tight tolerance, the tubes are produced by precision cold drawn and cold rolling, then bright annealed in a protected atmosphere, afterwards it is blackphosphated on the surface Production process: DIN series tubes, cold drawn and bright annealed precision seamless steel tube is used as the tube to be phosphated. The phosphorization is
  • Precision Seamless Galvanized Steel Tubes DIN2391 EN103052 ST35.0 ST37

    Precision Seamless Galvanized Steel Tubes DIN2391 EN103052 ST35.0 ST37 Production Process: Cold rolling by Cold pilger machine and Cold rolling machine,galvanized and zinc plated could be applied. Cold Rolled and Galvanized Steel Tube Production process: DIN highly accurate, cold rolled and bright seamless steel tube is used as the tube to be galvanized. The outer wall of tube is electroplated. The caps are covered at two ends of tube to prevent from the dust. Main Features:

Send An Inquiry