Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

SA210 GrA GrB Cold Drawn Seamless Steel Tube Low Carbon Boiler Steel Tubes

Minimum Order Quantity : 5 tons Packaging Details : Packed in hexagonal in bundles
Delivery Time : 45-60 days Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 50 tons per month
Place of Origin: China Brand Name: Torich
Certification: ISO,CE Model Number: SA210

Detail Information

Name: Seamless Cold Drawn Low Carbon Boiler Steel Tubes OD: 12.7-127mm
WT: 0.9-12.7mm Usage: Boiler Tubes, Heat Exchanger Tubs,etc
Material: GrA GrB Technics: Cold Drawn
High Light:

cold drawn steel tube

,

cold drawn tubes

Product Description

TORICH SA210 GrA GrB Seamless Cold Drawn Low Carbon Boiler Steel Tubes
Introduction:
 

NameSeamless Cold Drawn Boiler Tubes
OD12.7-127mm
WT0.9-12.7mm
TechnicsCold drawn
TypeSeamless
GradeGrA ,GrB,etc
Surface Pickling, blast cleaniing
Section shapeRound
PaymentL/C,T/T,Money Gram,Western Union,etc
DeliveryFOB,CIF,CFR,CPT,etc

 
Production method:Pipes shall be manufactured according to seamless process, and hot or cold finishing shall be adopted according to regulations.

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

 

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

Show:

SA210 GrA GrB Cold Drawn Seamless Steel Tube Low Carbon Boiler Steel Tubes 0SA210 GrA GrB Cold Drawn Seamless Steel Tube Low Carbon Boiler Steel Tubes 1SA210 GrA GrB Cold Drawn Seamless Steel Tube Low Carbon Boiler Steel Tubes 2SA210 GrA GrB Cold Drawn Seamless Steel Tube Low Carbon Boiler Steel Tubes 3

 

Q&A

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

 

Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.

 

Q:How is your production capability?
A:1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment

Q:How to get the sample?
A:1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

Get in touch with us

Enter Your Message