Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

Cold Rolled Seamless Stainless Steel Tube Boiler Tubes JIS 3459 1 - 12 M Length

Minimum Order Quantity : 5 tons Packaging Details : Seamless Stainless Boiler Tubes packed in wooden boxes or hexagonal bundles in seaworthy packing.
Delivery Time : 15-35 days Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 20000 tons per year
Place of Origin: Zhejiang, China Brand Name: TORICH
Certification: ISO Model Number: JIS 3459

Detail Information

Technical:: Hot Rolled, Cold Rolled Usage:: Boiler Pipes
Lengh:: 1-12 M Tolerance:: ±1%
High Light:

stainless steel round tube

,

stainless tube steel

Product Description

Cold Rolled Seamless Stainless Steel Tube Boiler Tubes JIS 3459 1 - 12 M Length

Product Overview:

 

Product name Torich JIS 3459 Seamless Stainless Steel Tube Boiler Tubes
Technical Hot Rolled, Cold Rolled
Size Range

OD:10.0-660.4 mm

WT:1.0-34.4 mm

Length: 1-12 m

or according to customers' actual application and production.

Application For Boiler,Chemical,Medical,etc.

 

Product Show:

 

 

 

Company Introduction:

 

TorichInternational Co.,Ltd is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes.

Our main products:Seamless Steel Tubes with Carbon and Alloy Steel Grade, Welded Precision Steel Tubes,DOM Steel Tubes, Seamless & Welded Stainless Steel Tubes with Nickel and Alloy Steel Tube.

Our factory was established since 1997, with the name of Haiyan SanxinSteel Pipe Co., Ltd. The factories’ technicians are of great engineering experience in steel pipe industry for more than 20 years, who are in great command of production technology for Cold Drawing and Cold Rolling, as well as heat treatment and inspection. So we have strong technician team and manufacturing capability.

 

 

 

Quality Control


1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

 

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

Torich JIS 3459 Seamless Stainless Steel Tube Boiler Tubes

 

You Might Be Into These
Get in touch with us

Enter Your Message

sales5@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628