EN 10305-3 E195 ERW Welded Cold Sized Carbon Steel Tube For Precision Applications
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 1 Ton | Packaging Details : | In bundles |
---|---|---|---|
Delivery Time : | 4-6 Weeks | Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 500 Tons Per Month |
Place of Origin: | Zhejiang China | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO 9001 | Model Number: | TORICH DIN2393-2 St52.3 |
Detail Information |
|||
Thickness: | 0.5 - 12 Mm Mm | Outer Diameter(Round): | 12 - 128 Mm Mm |
---|---|---|---|
Application: | Mechanical Purpose | Tolerance: | ±10% |
Name: | Precision Steel Tube | ||
High Light: | precision steel pipe,precision seamless pipe |
Product Description
TORICH DIN2393-2 St52.3 Welded Precision Carbon Car Shock Absorber Steel Tube
1. Quick Detail:
Black Phosphated Hydraulic Tubes with High Precision
EN10305-1, EN10305-4, DIN2391,
E235, E355, ST37.0, ST44.0, ST52.0
2. Production process:
DIN series tubes, cold drawn and bright annealed precision seamless steel tube is used as the tube to be phosphated. The phosphorization is realized with the imported chemical fluid to form a black film. The antirust oil is absorbed by means of the micropore on the film to prevent the tubes from getting rust.
3. Main Features:
Bright black color is homogeneously distributed on the tube surface. The tube has good property of antirust.
4. Main Application:
For auto industry, machinery use, oil cylinder, motorcycle shock absorber
5. Our products are widely used in:
Engineering machinery Machine tool industry Hydraulic industry Special vehicle
Automobile pipeline Heavy machinery Compressor Shipbuilding industry
Railway locomotive Diesel engine Utility boiler Injection molding machine
Power equipment Heavy duty automobile Forging and stamping machine
6. Main Characteristics:
No Oxidation Layer on the Outer and Inner Walls
No Crack under Flaring and Flattening
No Leakage under High Pressure
No Distortion after Cold Bending
High Precision High Cleanness Excellent Brightness
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
TORICH DIN2393-2 St52.3 Welded Precision Carbon Car Shock Absorber Steel Tube
Enter Your Message