logo

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Seamless Steel Tube
Created with Pixso.

ASTM A519 1010 1020 1026 Carbon Steel Seamless Tube Cold Rolling For Boiler

ASTM A519 1010 1020 1026 Carbon Steel Seamless Tube Cold Rolling For Boiler

Brand Name: TORICH
Model Number: ASTM A519
MOQ: 5Tons
Price: negotiable
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 5000Tons per Year
Detail Information
Place of Origin:
ZHEJIANG, CHINA
Certification:
ISO9001, ISO14001, TS16949
Keyword:
Carbon Steel Seamless Tube
Material:
SAE1010 SAE1020 SAE1026 SAE4130 SAE4140
OD:
50-350mm
WT:
1-25mm
Production Method:
Seamless Cold Drawing Or Cold Rolling
Size Method:
HF-Hot Finished, CW-Cold Worked, RT-Round Turner, G-Ground
Application:
For Boiler And Heat Exchanger
Length:
Cutting Length As Customers' Requirements
Packaging Details:
Carbon Steel Tubes are packed in wooden boxes in seaworthy packing.
Supply Ability:
5000Tons per Year
Highlight:

seamless steel pipe

,

seamless carbon steel tube

Product Description
Products Description
 
TORICH ASTM A519 1010 1020 1026 SRA +N Seamless Steel Tube Carbon Steel Seamless Tube
Material
SAE1010, SAE1020, SAE1026, SAE4130, SAE4140
Size
WT: 1-25mm; OD: 50-350mm; Length: max 12m
Production Method
Seamless Cold Drawing Or Cold Rolling
End protector
Plain End / Beveled End
Test
Tension Test, Flaring Test, Flange Test, Reverse Test,
Hardness Test, Hydrostatic or Nondestructive Electric Test

Sizing method:                                   Thermal Treatment:
1) HF-Hot finished                                1) A-Annealed
2) CW-Cold worked                              2) N-Normalized
3) RT-Round Turner                             3) QT-Quenched and Tempered
4) G-Ground                                         4) SR-Stress relieved or Finish Anneal
 
Product Show
ASTM A519 1010 1020 1026 Carbon Steel Seamless Tube Cold Rolling For Boiler 0ASTM A519 1010 1020 1026 Carbon Steel Seamless Tube Cold Rolling For Boiler 1ASTM A519 1010 1020 1026 Carbon Steel Seamless Tube Cold Rolling For Boiler 2ASTM A519 1010 1020 1026 Carbon Steel Seamless Tube Cold Rolling For Boiler 3

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

PACKING:
Each tube in a plastic bag, then put tubes in a seaworthy woven bag ,each unit weight 400kg-500kg/bundle.
With strong wood structure box packing by containers loading and shipping.
Or as customer's requirement.
20 ft container - GP: 5.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 25MT/container.
40 ft container - GP: 11.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 27MT/container.
40 ft container - HG: 11.8m (Length) * 2.13m (Width) * 2.72m (Height) ------ Max Gross Weight: 27MT/container.
Port Shanghai

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us