Brand Name: | TORICH |
Model Number: | GB/T 3624 |
MOQ: | 5Tons |
Price: | negotiable |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 5000Tons per Year |
Key Word | Titanium Alloy Steel Tube |
Material | TA1,TA2,TA3,TA8,TA8-1,TA9,TA9-1,TA10 |
Size | OD: 4-114mm; WT: 0.2-4.5; Length: 1-12m |
Application | Aerospace, petrochemical, shipbuilding, automobile, medicine etc. |
Mechanical Porperties
Alloy Grade | Tensile strength /Mpa | specified non-proportional extension strength /Mpa | percentage elongation after fracture % |
TA1 | ≥240 | 140-310 | ≥24 |
TA2 | ≥400 | 275-450 | ≥20 |
TA3 | ≥500 | 380-550 | ≥18 |
TA8 | ≥400 | 275-450 | ≥20 |
TA8-1 | ≥240 | 140-310 | ≥24 |
TA9 | ≥400 | 275-450 | ≥20 |
TA9-1 | ≥240 | 140-310 | ≥24 |
TA10 | ≥460 | ≥300 | ≥18 |
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us