A333 Gr.6 Low Temperature Alloy Seamless Steel Pipe Large Diameter Thick Wall
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5 Ton | Price : | 800-850 USD per Ton |
---|---|---|---|
Packaging Details : | standard package with plastic bags and strapped bundles or as client's requirement | Delivery Time : | 5-8 weeks |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 100000 Tons per Year |
Place of Origin: | Zhejiang China | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO 9001 | Model Number: | ASTM A513 |
Detail Information |
|||
Standard: | ASTM, API, ASTM, Aisi 1026 | Grade Group: | 10#-45# |
---|---|---|---|
Thickness: | 1.5 - 15 Mm | Outer Diameter: | 18 - 230 Mm |
Certification: | ISO | Alloy Or Not: | Non-alloy |
Surface Treatment: | Oiled | Type: | Weled Pipe |
End Protector:: | Reqeust | Keyword: | DOM Steel Tube |
High Light: | drawn over mandrel steel tubing,dom metal tubing |
Product Description
ASTM A513 1020 DOM Cold Drawn Welded Steel Tube
ASTM A513 1020 DOM Cold Drawn Welded Steel Tube
Thickness | 1.5-15mm |
Out Diameter | 18-230mm |
Length | 5-12meter |
Standard | 1026 |
Application | cold drawn seamless 1026 dom steel tube price is widely used in following fields: |
End | Threading ,coupling and with plastic caps protected |
Surface | Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,etc. |
Payment | T/T,L/C |
Trade | FOB,CFR,CIF |
Packing | Plastic caps on both ends, Steel bundle, Woven bag or acc. To customers' request |
Delivery | Within 30 days after receiving 30% T/T of deposit or L/C |
How to get the sample?
1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.
What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation
Who are your customers?
1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc
How long will you react on our requirement?
1.Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!
Any more questions about your doubts, please feel free to send us your emails or call!
Enter Your Message