Send Message

Medium Carbon Steel Seamless Tube Oiled Surface For Boiler / Superheater

Product Details:
Place of Origin: ZHEJIANG, CHINA
Brand Name: TORICH
Certification: ISO9001, TS16949
Model Number: ASTM A210/A210M-02
Payment & Shipping Terms:
Minimum Order Quantity: 1Tons
Price: negotiable
Packaging Details: Seamless Medium-Carbon Steel Tubes Boiler And Superheater Tubes packed in wooden boxes or in hexagonal bundles, in seaworthy packing.
Delivery Time: 30-45work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 25000Tons per Year

Detail Information

Surface: Oiled Material: 10#.20#.45#.Q195.Q215.Q235
Shape: Round Shape OD: 12.7-127mm
WT: 0.9-12.7mm Usage: Boiler And Superheater
High Light:

seamless steel pipe

,

seamless carbon steel tube

Product Description

TORICH A210/A210M-02 Seamless Medium-Carbon Steel Tubes Boiler And Superheater Tubes

product description

Medium Carbon Steel Seamless Tube Oiled Surface For Boiler / Superheater 1

Standard: A210/A210M-02 Seamless Medium-Carbon Steel Tubes Boiler And Superheater Tubes

 

Usage: This standard is applicable to Seamless Medium-Carbon Steel Tubes for boiler and Superheater Tubes

Production process: Seamless tube can be produced by Hot Treatment, Cold Drawing or Cold Rolling.

 

OD: 12.7-127mm

WT: 0.9-12.7mm

 

Certification: ISO9001, ISO16949

 

Note: Special steel grade is also available, according to customer request.

 

Chemical Requirements:

                                                                                                                                                                   

Element Grade A-1 Grade C
Carbon, max 0.27 0.35
Manganese 0.93 max 0.29-1.06
Phosphorus, max 0.035 0.035
sulfur, max 0.035 0.035
Silicon, min 0.10 0.10

 

Medium Carbon Steel Seamless Tube Oiled Surface For Boiler / Superheater 2

Medium Carbon Steel Seamless Tube Oiled Surface For Boiler / Superheater 3

 

Tag: Seamless Boiler Tubes, Superheater Tubes

 

 

 

company introduction

 

-1

 

production workshop

 

seamless stainless steel tubes for boiler and heat exchanger

 

our certificate

 

seamless stainless steel tubes for boiler and heat exchanger

 

 

FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

Get in touch with us

Enter Your Message

You Might Be Into These
sales9@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628