
GB/T8162 Q235 Structural Seamless Steel Tubes Thick Wall Tube For Heat Exchanger
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 0.5Ton | Price : | USD700-1200/TON |
---|---|---|---|
Packaging Details : | Chinese Leading Manufacturer GB3087 Q235 Carbon Seamless Steel Pipe,In plywood case,In wooden box. | Delivery Time : | 30-45Work Days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 50000Ton/year |
Place of Origin: | China | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO9001 ISO14001 | Model Number: | GB5310 |
Detail Information |
|||
Product Name: | Chinese Leading Manufacturer GB5310 Q235 Cold Drawn Carbon Seamless Steel Pipe | Keyword: | GB5310 Q235 Cold Drawn Carbon Seamless Steel Pipe |
---|---|---|---|
Type: | Seamless Steel Pipe | Surface: | Oiled |
Material: | Q345 10# 20# Q235 | Usage: | Boiler Pipe |
Shape: | Round | Length: | 4-12.5m |
OD: | 4-1200mm | WT: | 0.5-200mm |
High Light: | precision steel pipe,precision pipes and tubes |
Product Description
Steel Grade/Steel Material: Q345 Q195 10# 20#
Steel pipe standard: GB5310
Characteristic:
Good concentricity
Good OD and ID tolerance
High Precision
Stable quality
Smooth Roughness
TORICH QUALITY ASSURANCE
Size:
OD:4-1200mm
WT:0.5-200mm
Length: 5.8m, 6m, 11.8m, 12m, or as required.
Production Processs:
RAW MATERIAL
↓
INCOMING INSPECTION
↓
STORAGE → CUTTING→HAMMERING → PICKING LUBRICATION → CLEANING → PHOSPHORI CLEAN
↓
ENDS CUTTING←STRAIGHTENING←HEAT TREATMENT↔MIDDLLE CHECK↔ COLD DRAWING ← LUBRICATING ↓
FINAL INSPECTION→BUNDING→STORAGE
Application: | Boiler | Heat Exchanger | Petroleum | Aerospace | Chemical | Electric Power | Military | structure |
Technique:
1) Hot Rolled
2) Cold Drawn
3) Cold Rolled
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Chinese Leading Manufacturer GB5310 Q235 Cold Drawn Carbon Seamless Steel Pipe
Enter Your Message