Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

ASTM B359 C101000 C10200 Seamless Copper Tube

Minimum Order Quantity : 2 tons Price : $1050-1200
Packaging Details : Packing in bundles Delivery Time : 35-40 work days
Payment Terms : L/C, D/A, D/P, MoneyGram, Western Union Supply Ability : 35 tons per month
Place of Origin: China Brand Name: Torich
Certification: CE,ISO Model Number: ASTM B359

Detail Information

Name: A C10STM B3591000 Copper Seamless Condenser Steel Tube Grade: C10100 C10200 C10300 C10800 C12000 C12200
Standard: ASTM B359 Application: Condenser, Heat Exchanger With Integral Fins
High Light:

C10200 seamless copper tube

,

ASTM B359 seamless copper tube

,

C101000 seamless copper tube

Product Description

ASTM B359 Copper Seamless Condenser Steel Tube

Standard Specificition for copper and copper -alloy seamless condenser and heat exchanger tubes with integral fins

Referenced Documents

B153 Test Method for Expansion of copper and copper-alloy pipe and tubing

B154 Test Method for Mercurous Nitrate test for copper alloys

B170 Specification for Oxygen ferr electrolytic copper rrefinery shapes

B224 Classification of coppers

B601 Classification for temper designations for copper and copper alloys wrought and cast

B846 Terminology for copper and copper alloys

B900 Prwactice for packing of copper and copper alloy mill products for US government agencies.

Material:

C10100 C10200 C10300 C10800 C12000 C12200 C14200 C19200 C23000 C44300 C44400 C44500 C60800 C68700 C70400 C70600 C70620 C71000 C71500 C71520 C72200

Key words:

Condenser, copper,copper alloys , heat exchanger, integral fins, seamless, tube, UNS No C10100,UNS No C10200, UNS No C10300, UNS No C10800, UNS No C12000, UNS No C12200, UNS No C14200, UNS No C19200, UNS No C23000, UNS No C44300, UNS No C44400, UNS NoC44500.

Application: condenser integral fins, heat exchanger integral fins

Name ASTM B359 C101000 C10200 Copper Seamless Condenser Steel Tube
Standard ASTM B359
Grade C10100 C10200 C10300 C10800 C12000 C12200 C14200 C19200 C23000 C44300 C44400 C44500
Production method Seamless 

Show:
ASTM B359 C101000 C10200 Seamless Copper Tube 0ASTM B359 C101000 C10200 Seamless Copper Tube 1ASTM B359 C101000 C10200 Seamless Copper Tube 2ASTM B359 C101000 C10200 Seamless Copper Tube 3ASTM B359 C101000 C10200 Seamless Copper Tube 4Show:

ASTM B359 C101000 C10200 Seamless Copper Tube 5ASTM B359 C101000 C10200 Seamless Copper Tube 6ASTM B359 C101000 C10200 Seamless Copper Tube 7

QUALITY CONTROL:

1.Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

Q&A

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

 

Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.

 

Q:How is your production capability?
A:1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment

Q:How to get the sample?
A:1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

sales3@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628