logo

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Welded Steel Tube
Created with Pixso.

Automobile Double Wall PVF Coating Welded Steel Tube

Automobile Double Wall PVF Coating Welded Steel Tube

Brand Name: Torich
Model Number: JASO M101-94
MOQ: 2 tons
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 30 tons per month
Detail Information
Place of Origin:
China
Certification:
CE,ISO
Name:
JASO M101-94 Single Wall Electrical Welded Steel Tubes For Automobiles Industries
Standard:
JASO M101-94
Usage:
Using In Automobile And Refrigerators Industries
Surface Treatment:
PVF Coating And Zinc Plating
Model:
JASO M101-94
Certification:
CE,ISO
Packaging Details:
Packing in plastic bags
Supply Ability:
30 tons per month
Highlight:

JASO Welded Steel Pipe

,

PVF Coating Welded Steel Tube

Product Description

JASO M101-94 Single Wall Electrical Welded Steel Tubes for Automobiles Industries

Brief introduction:

Product name JASO M101-94 Single Wall Electrical Welded Steel Tubes for Automobiles Industries
Standard GM123M, GM124M, TS7600G, GB 11258-89
Grade Low carbon steel, such as SPCC BLD BLC
Raw material Cold rolled low carbon steel strip
Application Evaporator in refrigerators
Surface treatment  PVF Coating and zinc plating
Advantage Good Surface Quality, Uniform coating,
No coating burr
Stable quality
Excellent corrosion resistance

 

Electrical welded single wall steel tubes is used for automobiles and refrigerators industries. Most product features are quite similarto double wall steel tube.

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc

8. Packing and Stocking 

 

Q&A

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

 

Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.

 

Q: How is your production capability?
A: 1. 2000 tons monthly production capacity, 5000 tons monthly trading capability
2. Prompt and Timely shipment

Q:How to get the sample?
A:1. You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2. Sample charges will be refunded when order is placed.

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking