GB/T 8162 42CrMo Alloy Steel Tube Cold Drawn Carbon Steel Alloy Steel Pipr For Mechanical
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5 tons | Packaging Details : | Packed in hexagonal in boxes |
---|---|---|---|
Delivery Time : | 45-60 work days | Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 50000 tons per year |
Place of Origin: | China | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO,CE | Model Number: | GB/T3094-2000 ASTM A500 |
Detail Information |
|||
Product Name: | Square Steel Tube | Standard: | ASTM A500,GB/T3094-2000 |
---|---|---|---|
Length: | 4000mm-12000mm | Usage: | Construction |
Terms Of Payment: | T/T,L/C,Money Gram, Western Union | Terms Of Delivery: | FOB,CIF,CFR,CPT,etc |
High Light: | alloy steel tube,alloy steel seamless tube |
Product Description
Product name | Square steel tube |
Standard | ASTM A500 GB/T3094 |
Length | 4000mm-12000mm |
Usage | Construction ,etc |
Material | 20#, 45# ,etc |
Terms of payment | T/T,L/C,Money Gram, Western Union |
Terms of delivery | FOB,CIF,CFR,CPT |
Delivery date | 45-60 work days |
Product show:
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A&Q
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of SCM 440 42CrMo Mechanical Tubing for Reinforcement sleeve for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Enter Your Message