Brand Name: | TORICH |
Model Number: | BS6323-6 |
MOQ: | 5Tons |
Price: | USD600-1200/ton |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 5000Tons per Year |
Material | CEW1a CEW2a CEW3a CEW4a CEW5a |
Size | WT: 1-35mm; OD: 6-350mm; Length: max 12m |
Production Method | Seamless Cold Drawing Or Cold Rolling/Electric Resistance Welded |
Applications | For Auto Industry / For Machinery Use/mechanical And General Engineering Purposes |
Test | Flattening test, Drift expanding test, Leak tightness test. |
Method of Manufacture:
The tubes are manufactured from flat rolled strip, longintudinally welded continuously by the passage of an electric current across the abutting edges without the addition of filler metal.
They are subsequently cold finished normally on both the inside and outside surfaces, where it is permissble to have both an adherent layer of residual lubricant originating from the drawing process and visible traces of the internal weld upset.
If phosphate or other residues are detrimental to subsequent processing, their removal shall be the subject of an agreement between the manufacturer and purchaser.
Delivery Condition:
The tubes are supplied in one of the following condition:
a. Cold finished/hard (cod finished as drawn) : BK
b. Cold finished/soft (lightly cold worked ): BKW
c. Annealed: GBK
d. Annealed (including de-scaling): GZF
e. Normalized: NBK
f. Normalized ( including de-scaling): NZF
It is permissible for tubes supplied in the GBK and NBK conditions to be discoloured, but they shall be free from loose scale.
Where tubes, in the GBK condition are required bright annealed, this shall be the subject of an agreement between the purchaser and the manufactuer.
Chemical Compositions:
Steel Grade | C, max | Si, max | Mn, max | P, max | S, max |
CEW1a | 0.13 | - | 0.60 | 0.050 | 0.050 |
CEW2a | 0.16 | - | 0.70 | 0.050 | 0.050 |
CEW3a | 0.20 | 0.35 | 0.90 | 0.050 | 0.050 |
CEW4b | 0.25 | 0.35 | 1.20 | 0.050 | 0.050 |
CEW5b | 0.23 | 0.50 | 1.50 | 0.050 | 0.050 |
Mechanical Properties:
| BKc (cold finished/hard) | BKWc (cold finished/soft ) | ||||
Re min. N/mm2 | Rm min. N/mm2 | A min. % | Re min. N/mm2 | Rm min. N/mm2 | A min. % | |
CEW1a | 320 | 400 | 6 | 245 | 350 | 10 |
CEW2a | 355 | 420 | 6 | 260 | 370 | 10 |
CEW3a | 360 | 450 | 6 | 280 | 400 | 9 |
CEW4b | 415 | 520 | 5 | 315 | 450 | 8 |
CEW5b | 480 | 600 | 4 | 385 | 550 | 6 |
| GBK and GZF (annealed) | NBK and NZF (normalized) | ||||
Re min. N/mm2 | Rm min. N/mm2 | A min. % | Re min. N/mm2 | Rm min. N/mm2 | A min. % | |
CEW1a | 150 | 270 | 27 | 155 | 280 | 25 |
CEW2a | 160 | 300 | 27 | 195 | 320 | 25 |
CEW3a | 170 | 340 | 26 | 215 | 360 | 24 |
CEW4b | 200 | 400 | 24 | 235 | 410 | 22 |
CEW5b | - | - | - | 340 | 490 | 20 |
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
PACKING:
Each tube in a plastic bag, then put tubes in a seaworthy woven bag ,each unit weight 400kg-500kg/bundle.
With strong wood structure box packing by containers loading and shipping.
Or as customer's requirement.
20 ft container - GP: 5.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 25MT/container.
40 ft container - GP: 11.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 27MT/container.
40 ft container - HG: 11.8m (Length) * 2.13m (Width) * 2.72m (Height) ------ Max Gross Weight: 27MT/container.
Port Shanghai
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us