DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 10Tons | Price : | USD900-1200/Ton |
---|---|---|---|
Packaging Details : | Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing. | Delivery Time : | 30-45 work days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 2000Tons per Year |
Place of Origin: | ZHEJIANG, CHINA | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO9001, ISO14001, TS16949 | Model Number: | EN10297-1 |
Detail Information |
|||
Keyword: | Heavy Wall Steel Tubing/pipe | Material: | E235, E275, 38Mn6, 41Cr4, 25CrMo4 Etc |
---|---|---|---|
Surface: | Oiled | Shape: | Round Shape |
Length: | Max 12000mm | WT: | 1-30mm |
OD: | 6-168mm | Usage: | Mechanical And Gneral Engineering Purposes |
High Light: | structural steel tubing,cold formed steel tube |
Product Description
Standard | EN10297-01 |
Matrial | Fine Grain Steel, E235, E275, E315, E355, E470, C15, C22, 38Mn6, 41Cr4, 25CrMo4, 30CrMo4, 34CrMo4, 42CrMo4 |
Size | OD: 2-168mm WT: 1-30mm Length: max12000mm |
Application | For mechanical and gneral engineering purposes |
Manufacture | The tubes are manufactured by Seamless Cold Drawn or Seamless Cold Rolling |
Delivery condition | Normalizin rolling process or normalized by heat treatment in a furnance |
Steel Grade | C | Si | Mn | P | S | Other |
| min max | min max | min max | max | max | Al min 0.010 N max0.020 Nb max0.07 V 0.08/0.15 |
1.0380 | 0.17 | 0.35 | 1.20 | 0.030 | 0.035 | |
1.0025 | 0.21 | 0.35 | 1.40 | 0.030 | 0.035 | |
1.0236 | 0.21 | 0.30 | 1.50 | 0.030 | 0.035 | |
1.0580 | 0.22 | 0.55 | 1.60 | 0.030 | 0.035 | |
1.0536 | 0.16 0.22 | 0.10 0.50 | 1.30 1.70 | 0.030 | 0.035 |
Product Show
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
TORICH EN10297-1 Seamless Cold Drawn Heavy Wall Carbon Steel Structure Tubing/pipe
Enter Your Message