
Automobile High Carbon Chromium 100cr6 Bearing Tube 16MnCr5
Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | Torich |
Certification: | ISO 9001:2008 , TS16949, CCS , DNV , GL , PED |
Model Number: | Alloy Steel Pipe 20MnCr5 , 20CrMn |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 5MT |
Price: | negotiable |
Packaging Details: | Seaworthy Packing in bundles |
Delivery Time: | 30~40days |
Payment Terms: | L/C, T/T |
Supply Ability: | 7000MT/Month |
Detail Information |
|||
Production: | Seamless Cold Drawn | Keyword: | Cold Rolled Steel Tube |
---|---|---|---|
Type: | Seamless Tube | Application: | Engineering And Mechanical |
Materail: | Alloy Steel | Grade: | 34CrMo4 42CrMo4 42CrMo |
Brand: | TORICH | Payment: | FOB |
High Light: | alloy steel tube,seamless alloy steel pipe |
Product Description
34CrMo4 42CrMo4 42CrMo Seamless Cold Drawn/Cold Rolled steel tube
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
RFQ
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Enter Your Message