Cold Drawn / Cold Rolled Seamless Alloy Steel Tube 34CrMo4 42CrMo4 42CrMo

Product Details:
Place of Origin: China
Brand Name: Torich
Certification: ISO 9001:2008 , TS16949, CCS , DNV , GL , PED
Model Number: Alloy Steel Pipe 20MnCr5 , 20CrMn
Payment & Shipping Terms:
Minimum Order Quantity: 5MT
Price: negotiable
Packaging Details: Seaworthy Packing in bundles
Delivery Time: 30~40days
Payment Terms: L/C, T/T
Supply Ability: 7000MT/Month

Detail Information

Production: Seamless Cold Drawn Keyword: Cold Rolled Steel Tube
Type: Seamless Tube Application: Engineering And Mechanical
Materail: Alloy Steel Grade: 34CrMo4 42CrMo4 42CrMo
Brand: TORICH Payment: FOB
High Light:

alloy steel tube

,

seamless alloy steel pipe

Product Description

34CrMo4 42CrMo4 42CrMo Seamless Cold Drawn/Cold Rolled steel tube



34CrMo4:
C: 0.30-0.37
Si: 0.40
Mn: 0.40-0.90
P: 0.035
S: 0.035
Cr: 0.90-1.20
Mo: 0.15-0.30
 
42CrMo4:
C: 0.38-0.45
Si: 0.40
Mn: 0.60-0.90
P: 0.035
S: 0.035
Cr: 0.90-1.20
Mo: 0.15-0.30
 
42CrMo:
C: 0.38-0.45
Si: 0.17-0.37
Mn: 0.50-0.80
Cr: 0.90-1.20
Mo: 0.15-0.25
 
Main Characteristics:
No Oxidation Layer on the Outer and Inner Walls
No Crack under Flaring and Flattening
No Leakage under High Pressure
No Distortion after Cold Bending
High Precision High Cleanness Excellent Brightness
 
Cold Drawn / Cold Rolled Seamless Alloy Steel Tube 34CrMo4 42CrMo4 42CrMo 0Cold Drawn / Cold Rolled Seamless Alloy Steel Tube 34CrMo4 42CrMo4 42CrMo 1

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

RFQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

Get in touch with us

Enter Your Message

You Might Be Into These
sales3@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628