
GB/T8162 Q235 Structural Seamless Steel Tubes Thick Wall Tube For Heat Exchanger
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5 TONS | Price : | 900-1500 USD PER TON |
---|---|---|---|
Packaging Details : | packing in anti-rust oil p in bundles or wooden box | Delivery Time : | 20-45 DAYS |
Payment Terms : | T/T, L/C, D/A, D/P, Western Union, MoneyGram | Supply Ability : | 5000 TONS PER MONTH |
Place of Origin: | Zhejiang,China | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO9001,ISO14001,TS16949 | Model Number: | ASTM A179/A192 |
Detail Information |
|||
Product Name: | Boiler Tubes,Carbon Steel Heat Exchanger Tube From TORICH | Keyword: | Carbon Steel Heat Exchanger Tube |
---|---|---|---|
Application: | For High Pressure Boiler And Superheater Tubes | Standard: | ASTM A179/A192 |
Technique: | Cold Drawn | Material: | A179 Grade T1/T1a/T1b |
Surface: | According To Customer's Request | WT: | 1-25.4mm |
OD: | 12.7-177.8mm | Length: | Max12000mm |
High Light: | carbon steel tube,high carbon steel tube |
Product Description
Standard
|
ASTM A192
|
Matrial
|
10# 20# etc Carbon Steel
|
Size
|
OD: 12.7-177.8mm WT: 1-25.4mm Length: according to customer requirement
|
Application
|
For Boilers,Superheaters, Heat-Exchangers, High-pressure Boilers
|
Production
|
Tubes are manufactured by seamless process and both hot finished and cold finished are applicable
|
Heat treatment
|
Hot finished tubes need not be heat treated.
Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher |
C
|
0.06-0.18
|
Mn
|
0.27-0.63
|
P
|
≤0.035
|
S
|
≤0.035
|
Si
|
≤0.25
|
Brinell Hardness
|
Rockwell Hardness Number
|
WT≥0.200 in (5.1mm)
|
WT≤0.200 in (5.1mm)
|
137 HRB
|
77HRB
|
Mechanical Properties Tests and Inspection
Tensil Streghth: min ksi[Mpa] 47[325] Flattening Test Flaring Test
Yield Point: min ksi[Mpa] 26[180] Flange Test Hardness Test
Elongation: ≥35% Hydrostatic Test
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
Enter Your Message