logo
Home > products > Structural Steel Pipe >
Hot Finished Round Structural Steel Pipe / Structural Square Tubing DIN EN 10210-2

Hot Finished Round Structural Steel Pipe / Structural Square Tubing DIN EN 10210-2

structural steel tubing

structural steel square tubing

Place of Origin:

ZHEJIANG, CHINA

Brand Name:

TORICH

Certification:

ISO9001, ISO14001, TS16949

Model Number:

DIN EN 10210-2

Contact Us
Request A Quote
Product Details
Keyword:
Structural Steel Pipe
Material:
10#-45#, Q195-Q345, S235JRH, S355J2H Etc
OD:
50-2500mm
WT:
5-120mm
Length:
Customers' Requirements
Shape:
Square, Rectangular, Round
Surface:
Smooth And Oiled
Usage:
Structure Pipe
Highlight:

structural steel tubing

,

structural steel square tubing

Payment & Shipping Terms
Minimum Order Quantity
5Tons
Price
USD600-900/ton
Packaging Details
Structural Steel Pipes are packed in wooden boxes in seaworthy packing.
Delivery Time
30-45 work days
Payment Terms
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability
5000Tons per Year
Product Description
Products Description
 
DIN EN 10210-2 Hot Finished Round Structural Steel Pipe Structural Steel Square Tubing
Standard
DIN EN 10210-2 Hot finished structural hollow sections of non-alloy steel construction and fine grain steels
Material
10#-45#, Q195-Q345, S235JRH, S355J2H etc
Size
WT: 5-120mm; OD: 50-2500mm; Length: max 12m
Production Method
Seamless Cold Drawing Or Cold Rolling/Electric Resistance Welded
Applications
For Auto Industry / For Machinery Use/Structural Purposes
Test
Tension Test, Flaring Test, Flange Test, Reverse Test, Hardness Test, Hydrostatic or Nondestructive Electric Test etc

 

Structural hollow section manufacturing process:
Structural hollow sections are manufactured by seamless or by welding.
Welded sections manufactured by continuous process.
Electric welded hollow sections are supplied without trimming the internal weld bead.

 

Delivery condition:
Qualities JR, J0, J2 and K2 - Hot finished
Qualities N and NL - normalized. (normalized rolled)
- for accelerated cooling +DC
- for quenching and tempering +QT

 

Surface condition:
The hollow sections have a smooth surface corresponding to the manufacturing method used; bumps, cavities or shallow longitudinal grooves resulting from the manufacturing process are permissible, provided the thickness is within tolerance.

 

limit of the inner and outer weld reinforcement at submerged arc welded hollow sections

Wall thickness (mm)
Weld reinforcement (mm)
≤14.2
3.5
>14.2
4.8
 
Product Show
Hot Finished Round Structural Steel Pipe / Structural Square Tubing DIN EN 10210-2 0Hot Finished Round Structural Steel Pipe / Structural Square Tubing DIN EN 10210-2 1Hot Finished Round Structural Steel Pipe / Structural Square Tubing DIN EN 10210-2 2Hot Finished Round Structural Steel Pipe / Structural Square Tubing DIN EN 10210-2 3

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

PACKING:
Each tube in a plastic bag, then put tubes in a seaworthy woven bag ,each unit weight 400kg-500kg/bundle.
With strong wood structure box packing by containers loading and shipping.
Or as customer's requirement.
20 ft container - GP: 5.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 25MT/container.
40 ft container - GP: 11.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 27MT/container.
40 ft container - HG: 11.8m (Length) * 2.13m (Width) * 2.72m (Height) ------ Max Gross Weight: 27MT/container.
Port Shanghai

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

Send your inquiry directly to us

Privacy Policy China Good Quality Precision Steel Tube Supplier. Copyright © 2015-2025 TORICH INTERNATIONAL LIMITED . All Rights Reserved.