logo
Home > products > Welded Steel Tube >
ERW Steel Pipe ASTM A214 Carbon Steel Tube For Heat Exchanger

ERW Steel Pipe ASTM A214 Carbon Steel Tube For Heat Exchanger

ASTM A214 Carbon Steel Tube

ERW Carbon Steel Pipe

Heat Exchanger ERW Steel Tube

Place of Origin:

China

Brand Name:

Torich

Certification:

ISO 9001 TS16949

Model Number:

ASTM A214

Contact Us
Request A Quote
Product Details
Product Name:
ERW Steel Pipe ASTM A214 ERW Carbon Steel Tube For Heat Exchanger
Key Word:
ERW Carbon Steel Tube
Technique:
Cold Drawn
Section Shape:
Round
Surface:
Oil
Application:
Fluid Pipe,Oil Gas Pipe
Secondary Or Not:
Non-secondary
Alloy Or Not:
Non-alloy
Highlight:

ASTM A214 Carbon Steel Tube

,

ERW Carbon Steel Pipe

,

Heat Exchanger ERW Steel Tube

Payment & Shipping Terms
Minimum Order Quantity
5 Tons
Price
USD 650 - 850 per Ton
Packaging Details
Packed in wooden boxes or hexagonal bundles in seaworthy packing.
Delivery Time
30 - 45 days
Payment Terms
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability
5000 Tons per Year
Product Description

ERW Steel Pipe ASTM A214 ERW Carbon Steel Tube For Heat Exchanger

 

Product Description

 

Standard ASTM A214
O.D. 6 - 76.2 mm
W.T. 1 - 20 mm
Length Max 12000 mm
Application Condenser, Boiler, Heat Exchanger and etc.
Surface Finish Oiled

 

 

Chemical Composition:

Carbon,max,% 0.18
Manganese,% 0.27-0.63
Phosphorus,max,% 0.035
Sulfur,max,% 0.035

 

 

Test and Inspection:

Hardness Requirement

Mechanical Test

- Flattening Test

- Flange Test

- Reverse Test

- Hydrostatic or Nondestructive Electric Test

 

Product Show

ERW Steel Pipe ASTM A214 Carbon Steel Tube For Heat Exchanger 0ERW Steel Pipe ASTM A214 Carbon Steel Tube For Heat Exchanger 1ERW Steel Pipe ASTM A214 Carbon Steel Tube For Heat Exchanger 2

 

ERW Steel Pipe ASTM A214 Carbon Steel Tube For Heat Exchanger 3

 

FAQ

 

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider.

 

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

 

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

 

Q: What is your terms of payment ?

 

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us.

 

Send your inquiry directly to us

Privacy Policy China Good Quality Precision Steel Tube Supplier. Copyright © 2015-2025 TORICH INTERNATIONAL LIMITED . All Rights Reserved.