Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

En10305-1 Precision Steel Honed Tube E355 E235

Minimum Order Quantity : 2 Ton Price : $1600-1700/ton
Packaging Details : in hexagon packing Delivery Time : 25-35 Days
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 25 tons/year
Place of Origin: China Brand Name: TORICH
Certification: ISO,CE Model Number: En10305-1

Detail Information

Product Name: EN10305-1 Precision E355 Seamless Steel Tube E235 Carbon Steel Pipe Honed Tube Length: 5.8m-11.8m
Standard: Din2391 EN10305-1 WT: 0.5-8mm
OD: 4-76mm Usage: Hydraulic Cylinder, Honed Steel Tube
Surface Finish: Oiled Type: Carbon
Shape: Round Keyword: Seamless Precision Steel Tube
High Light:

e355 steel honed tube

,

precision steel honed tube

,

e235 honed tubing

Product Description

 EN10305-1 Precision E355 Seamless Steel Tube E235 Carbon Steel Pipe Honed Tube

1.Quick Details:

Name  EN10305-1 Precision E355 Seamless Steel Tube E235 Carbon Steel Pipe Honed Tube
Type  Carbon
Production  Cold drawn and seamless
Application  Hydraulic system, automotive industry, etc
OD  5-420mm
WT  0.5-25mm
Length  5.8m for 20GP, 11.8 for 40HQ
Production  35-45 days
Surafce  Oiled to prevent rust
Heat Treatment  according to requirement
Package  Packing in seaworthy package, wovan bags and oiled

2.Product Details:

(1) Honed tube: The quilted pipe is a kind of high-precision steel pipe material processed by cold drawing or hot rolling. Due to the advantages of no oxide layer on the inner and outer walls of the precision steel tube, no leakage under high pressure, high precision, high finish, no deformation in cold bending, no flaring, no cracks in flattening, etc., it is mainly used to produce products for pneumatic or hydraulic components, such as cylinders or Cylinder, can be seamless pipe. The chemical composition of the quilted grinding tube is carbon C, silicon Si, manganese Mn, sulfur S, phosphorus P, and chromium Cr.

(2)Characteristic:

High precision and small batch production

The cold drawn finished product has high precision and good surface quality.

The cross-sectional area of the steel pipe is more complicated.

The performance of the steel pipe is better, and the metal is denser

(3)Processing technology:
The quilted tube is processed by rolling, because the surface layer has residual compressive stress on the surface, which helps to close the tiny cracks on the surface and hinders the expansion of erosion. Therefore, the corrosion resistance of the surface can be improved, and the generation or expansion of fatigue cracks can be delayed, thereby improving the fatigue strength of the quilted mill. Through rolling forming, a layer of cold work hardening layer is formed on the rolling surface, which reduces the elastic and plastic deformation of the contact surface of the grinding pair, thereby improving the wear resistance of the inner wall of the quilting tube and avoiding burns caused by grinding. . After rolling, the reduction of surface roughness value can improve the fit properties.

(4)The principle of rolling processing: it is a pressure finishing process, which uses the cold plastic characteristics of the metal at room temperature, and uses the rolling tool to apply a certain pressure to the surface of the workpiece, so that the metal on the surface of the workpiece produces plastic flow and fills the original residue. In the low concave trough, the roughness value of the workpiece surface is reduced. Due to the plastic deformation of the rolled surface metal, the surface structure is cold hardened and the grains are thinned, forming a dense fibrous shape, and forming a residual stress layer, which improves the hardness and strength, thereby improving the wear resistance and corrosion resistance of the workpiece surface. Rolling is a non-cutting plastic processing method.

3.Product show:

En10305-1 Precision Steel Honed Tube E355 E235 0En10305-1 Precision Steel Honed Tube E355 E235 1En10305-1 Precision Steel Honed Tube E355 E235 2

4.FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

 

You Might Be Into These
Get in touch with us

Enter Your Message

sales3@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628