logo
Products
PRODUCTS DETAILS
Home > Products >
Chrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WT

Chrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WT

MOQ: 5Tons
Price: USD800-1500/ton
Standard Packaging: Seamless Hydraulic Pipes are packed in wooden boxes in seaworthy packing.
Delivery Period: 30-45 work days
Payment Method: L/C, D/A, D/P, T/T, Western Union,
Supply Capacity: 5000Tons per Year
Detail Information
Place of Origin
ZHEJIANG, CHINA
Brand Name
TORICH
Certification
ISO9001, ISO14001, TS16949
Model Number
EN10305
Keyword:
Seamless Hydraulic Pipe
Grade:
10#~45#,16Mn,Q195~Q345,ST35~ST52
OD:
30mm~250mm
WT:
0.5mm~18mm
Length:
Customer's Requirement
Application:
Hydraulic Cylinder Tube
Highlight:

honed hydraulic cylinder tubing

,

hydraulic cylinder pipe

Product Description
Products Description
 
TORICH EN10305 Chrome Plated Seamless Steel Tube for Hydraulic Pipe
Standard
EN10305, DIN239, DIN2445, GB/T 3639, GB 8713
Matrial
10#~45#,16Mn,Q195~Q345,ST35~ST52
Size
OD: 30mm~250mm WT: 0.5mm~18mm Length: according to customer requirement
Production
Tubes are manufactured by seamless process and both hot finished and cold finished are applicable
Test
Tension Test, Flaring Test, Flange Test, Reverse Test, Hardness Test, Hydrostatic or Nondestructive Electric Test
Delivery conditions
1. NBK(+N)
after cold forming, eventually above phase transition point, in a protective atmosphere of annealing oxidation medium
2. GBK(+A)
after cold forming, annealing in non oxidizing medium protective gas
3. BK(+C)
the final heat treatment after cold forming, therefore small steel pipe plastic, the plastic degree does not guarantee
4. BKW(+LC)
after final heat treatment, a tiny cold drawing deformation, continue again when machining steel pipe allowed inside certain limits cold deformation(bending, flaring)
5. BKS(+SR)
have a stress relief after cold forming, heat treatment, steel pipe can be carried out within a certain limit in the appropriate processing again

 

Chrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WT
 
Product Show
Chrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WTChrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WT

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

Products
PRODUCTS DETAILS
Chrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WT
MOQ: 5Tons
Price: USD800-1500/ton
Standard Packaging: Seamless Hydraulic Pipes are packed in wooden boxes in seaworthy packing.
Delivery Period: 30-45 work days
Payment Method: L/C, D/A, D/P, T/T, Western Union,
Supply Capacity: 5000Tons per Year
Detail Information
Place of Origin
ZHEJIANG, CHINA
Brand Name
TORICH
Certification
ISO9001, ISO14001, TS16949
Model Number
EN10305
Keyword:
Seamless Hydraulic Pipe
Grade:
10#~45#,16Mn,Q195~Q345,ST35~ST52
OD:
30mm~250mm
WT:
0.5mm~18mm
Length:
Customer's Requirement
Application:
Hydraulic Cylinder Tube
Minimum Order Quantity:
5Tons
Price:
USD800-1500/ton
Packaging Details:
Seamless Hydraulic Pipes are packed in wooden boxes in seaworthy packing.
Delivery Time:
30-45 work days
Payment Terms:
L/C, D/A, D/P, T/T, Western Union,
Supply Ability:
5000Tons per Year
Highlight

honed hydraulic cylinder tubing

,

hydraulic cylinder pipe

Product Description
Products Description
 
TORICH EN10305 Chrome Plated Seamless Steel Tube for Hydraulic Pipe
Standard
EN10305, DIN239, DIN2445, GB/T 3639, GB 8713
Matrial
10#~45#,16Mn,Q195~Q345,ST35~ST52
Size
OD: 30mm~250mm WT: 0.5mm~18mm Length: according to customer requirement
Production
Tubes are manufactured by seamless process and both hot finished and cold finished are applicable
Test
Tension Test, Flaring Test, Flange Test, Reverse Test, Hardness Test, Hydrostatic or Nondestructive Electric Test
Delivery conditions
1. NBK(+N)
after cold forming, eventually above phase transition point, in a protective atmosphere of annealing oxidation medium
2. GBK(+A)
after cold forming, annealing in non oxidizing medium protective gas
3. BK(+C)
the final heat treatment after cold forming, therefore small steel pipe plastic, the plastic degree does not guarantee
4. BKW(+LC)
after final heat treatment, a tiny cold drawing deformation, continue again when machining steel pipe allowed inside certain limits cold deformation(bending, flaring)
5. BKS(+SR)
have a stress relief after cold forming, heat treatment, steel pipe can be carried out within a certain limit in the appropriate processing again

 

Chrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WT
 
Product Show
Chrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WTChrome Plated Seamless Steel Tube , Steel Hydraulic Tubing 0.5mm~18mm WT

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us