ASTM A789 Super Duplex 2507 Pipe Cold Drawn Stainless Steel Tube For Petrochemical
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 1ton | Price : | USD2000-3000/ton |
---|---|---|---|
Packaging Details : | in bundles or in wooden box | Delivery Time : | 30-45 work days |
Payment Terms : | L/C, D/A, T/T, D/P, Western Union, MoneyGram | Supply Ability : | 5000Tons per Year |
Place of Origin: | ZHEJIANG, CHINA | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO9001, ISO14001, TS16949 | Model Number: | ASTM A312 |
Detail Information |
|||
Standard: | ASTM A312 | Technique: | Cold Worked |
---|---|---|---|
Alloy Or Not: | Not Alloy | Material: | 304 316 309s 310s 321 347 |
OD: | 10-420MM | WT: | 3-50MM |
Length: | As Customer's Require | Application: | High Temperature,chemical Industy |
High Light: | Welded Stainless Steel Tubes TP304,420mm Stainless Steel Tubes,Cold Worked Stainless Steel Seamless Pipe |
Product Description
Welded Heavily Cold Worked Stainless Tubes Steel Pipes TP304 TP316 SA312
Torich International Limited is a professional manufacturer and exporter of steel pipes.
Our main products are stainless steel tube,The material we usually use for producing heavily cold worked stainless steel tube is TP304,TP316,TP304H,TP309H,TP310H,TP321H,ect.and we have many experience in exporting welded stainless tubes.
Application:high temperature,chemical industy,mechanical equipment,ect
Standard:ASTM A312
Size Range
OD:10-420MM
WT:3-50MM
Length:As customer's require
Manufacture:
seamless(SML),
welded(WLD),
heavily cold worked(HCW)
Chemical composition,%
Grade | Carbon | Manganese | Phosphorus | Sulfur | Silicon | Nickel | Molybdenum |
304 | 0.08 | 2.00 | 0.045 | 0.030 | 1.00 | 18.0-20.0 | 8.0-11.0 |
304L | 0.035D | 2.00 | 0.045 | 0.030 | 1.00 | 18.0-20.0 | 8.0-13.0 |
316 | 0.08 | 2.00 | 0.045 | 0.030 | 1.00 | 16.0-18.0 | 11.0-14.0 |
316L | 0.035D | 2.00 | 0.045 | 0.030 | 1.00 | 16.0-18.0 | 10.0-14.0 |
Workshop for Stainless Tubes Steel Pipes:
Certification for Stainless Tubes Steel Pipes:
FAQ:
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-45 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
Enter Your Message