Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines

Minimum Order Quantity : 5MT Price : USD600-900per ton
Packaging Details : in anti rust protection, in hexagonal bundles. Delivery Time : 30~40days
Payment Terms : L/C, T/T Supply Ability : 6000MT/Month
Place of Origin: China Brand Name: Torich
Certification: ISO 9001:2008 , TS16949 Model Number: DIN EN 10210-1

Detail Information

Standard: EN10210-1 Material: Carbon Steel Or Alloy Steel
Shape: Round, Square, Rectangle, Oval Production: Hot-finish Or Cold-finish
High Light:

Round Hot Finished Heavy Wall Pipe

,

DIN EN 10210-1 Heavy Wall Steel Tubing

,

Pipelines Thick Wall Steel Pipe

Product Description

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 0

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines

Material

The material used for DIN EN 10210-1 hot finished heavy wall steel tubing and thick wall steel pipes is commonly known as structural steel. It is specifically designed for use in the construction industry, where high strength and durability are required. Structural steel is known for its excellent ability to withstand heavy loads and its suitability for various applications in pipelines and other structural frameworks.

Specification

Specification
DIN EN 10210-1

Key Features

The key features of DIN EN 10210-1 hot finished heavy wall steel tubing and thick wall steel pipes are as follows:

  • Hot finished: The manufacturing process involves hot rolling, which results in a seamless and uniform final product.

  • Heavy wall: The walls of these steel tubes and pipes are thick, providing additional strength and durability.

  • Suitable for pipelines: These steel tubes and pipes are ideal for use in manufacturing pipelines due to their strength and ability to withstand high pressure.

Chemical Composition

The chemical composition of DIN EN 10210-1 hot finished heavy wall steel tubing and thick wall steel pipes is as follows:

Element Composition Range
Carbon (C) 0.16% - 0.22%
Silicon (Si) 0.30% - 0.60%
Manganese (Mn) 1.20% - 1.60%
Phosphorus (P) 0.035% maximum
Sulfur (S) 0.035% maximum
Niobium (Nb) 0.015% - 0.06%
Vanadium (V) 0.02% - 0.15%

Mechanical Properties

The mechanical properties of DIN EN 10210-1 hot finished heavy wall steel tubing and thick wall steel pipes are as follows:

Property Value
Tensile Strength Minimum 470 MPa, Maximum 630 MPa
Yield Strength Minimum 355 MPa
Elongation Minimum 21%
Impact Strength Minimum 27 Joules at -20°C (-4°F)
Hardness Minimum 85 HRB and Maximum 100 HRB

Steel Grade

The steel grade used for DIN EN 10210-1 hot finished heavy wall steel tubing and thick wall steel pipes is S355J2H. This grade offers excellent weldability and impact resistance, making it suitable for a wide range of applications in the construction and manufacturing industries.

Application

DIN EN 10210-1 hot finished heavy wall steel tubing and thick wall steel pipes find application in various areas, including:

  • Manufacturing pipelines
  • Structural frameworks
  • Industrial machinery
  • Construction projects
  • Power plants

Possible Alternative Grades

There are several possible alternative grades that can be considered based on specific project requirements or availability. Some of the commonly used alternative grades to DIN EN 10210-1 hot finished heavy wall steel tubing and thick wall steel pipes are as follows:

  • S355NH
  • S420MH
  • S460NH

 

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 1

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 2     DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 3

 

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 4     DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 5

 

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 6

 

 

 

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 7

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 8

Haiyan Sanxin Steel Pipe Factory is a leading manufacturer of steel pipes in China. Located in a region with excellent geographical advantages, the factory is situated close to the Zhoushan Port and Ningbo Port.

Our factory covers an area of more than 25,000 square meters and has been in the steel pipe manufacturing business for 20 years. Over this period, we have accumulated a wealth of professional experience, which has helped us establish ourselves as a trusted name in the industry.

At our factory, we specialize in the production of various types of steel pipes, including stainless steel pipe, carbon steel pipe, copper pipe, steel pipe,seamless steel pipe and welded pipe. Our expertise in this field is evident from the 12 patents that we hold, which demonstrate our commitment to innovation and excellence.

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 9

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 10

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 11

DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing Thick Wall Steel Pipe For Manufacturing Pipelines 12

 

Q: Are you trading company or manufacturer ?

A: manufacturer,also can do trading.

 

Q: How long is your delivery time?

A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-40 days if the goods are not in stock, it is according to quantity.

 

Q: Do you provide samples? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

 

Q: What is your terms of payment ?

A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact with me.

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

sales@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628