GB/T 32964 Welded Steel Tube Stainless Steel Pipes For Liquefied Natural Gas
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5 Tons | Price : | USD 750-800 Per Ton |
---|---|---|---|
Packaging Details : | Anti Rust Oil Protection, in seaworthy packing | Delivery Time : | 4-6 Weeks |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 100 Tons Per Month |
Place of Origin: | Zhejiang | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO | Model Number: | EN10305-2 |
Detail Information |
|||
Section Shape: | Round,Square,Rectangular,Round/Square/Rectangular/Oval.etc,according To Customer | Secondary Or Not: | Non-secondary |
---|---|---|---|
Application: | Structure Pipe,motor Electric | Surface Treatment: | Oil,painted |
Special Pipe: | Thick Wall Pipe,precision Tube | Length: | 5.8-12m |
High Light: | welding steel tubing,electric resistance welded steel tube |
Product Description
Steel Grade/Steel Material:
E155 E195 E235 E275 E355
Delivery Condition:
1 BK Cold finished(hard)
2 BKW Cold finished(soft)
3 BKS Cold finished and stress-relieved
4 GBK Annealed
5 NBK Normalized
Size Range:
O.D.:6-350mm
W.T.:1-35mm
L:max12000mm
Characteristic:
Good concentricity
Good OD and ID tolerance
High precision
Stable quality
Smooth roughness
DOM Steel Tube Production Process:
Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage
Standard
|
DIN2391, EN10305, ASTM A519, GB/T 8713, GB/T3669...
|
Material
|
20# ,45# ,Q345B,Q345D,25Mn,27sIMn,E355/st52, SAE1026...
|
Specification
|
ID OD
|
2-30mm 20-350mm
|
|
I.D Tolerance
|
H8 H9
|
Length
|
3-6m (Customers usually choose the 4~5.8m)
|
Straightness
|
1/1000
|
Surface
|
polished or coating
|
Delivery time
|
25-45 days
|
Packing
|
Bundled with knitted plastic bag, wooden cases or according to customers' request.
|
application
|
Fluid and gas transport,decoration, construction,medical equipment, aviation,
|
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of E155,E195,E235,E275,E355 EN10305-2 Welded Cold drawn Precision Steel Tubes for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Enter Your Message