Home ProductsCarbon Steel Heat Exchanger TubesTORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length
Good quality DOM Steel Tube for sales
Good quality DOM Steel Tube for sales
Dear Richard, thks for your continous support to our company, we have faith in your company's product and services

—— Cassy

you always commit and manage to meet our very tight tolerence requirement,furthermore Torich International never fail our delivery.

—— Cassy

This is what we are looking for, a reliable and responsible supplier.

—— Cassy

I'm Online Chat Now

TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length

China TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length supplier
TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length supplier TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length supplier TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length supplier TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length supplier

Large Image :  TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length

Product Details:

Place of Origin: ZHEJIANG, CHINA
Brand Name: TORICH
Certification: ISO9001, ISO14001, TS16949
Model Number: ASTM A214

Payment & Shipping Terms:

Minimum Order Quantity: 5Tons
Price: USD900-2000/Ton
Packaging Details: Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.
Delivery Time: 30-45 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 2000Tons per Year
Contact Now
Detailed Product Description
Keyword: Heat-Exchanger Tubes Standard: ASTM A214
Material: Q215, Q235, Q195 OD: 6 - 76.2 Mm
WT: 1 - 20 Mm Length: 1000-1200 Mm
Surface: Free Of Scale Usage: Heat-Exchanger And Condenser

 
Products Description
 
TORICH ASTM A214 ERW Carbon Steel Heat-Exchanger and Condenser Tubes
Standard
ASTM A214, A450
Matrial
Q195, Q215, Q235 etc Carbon Steel
Size
OD: 6.76.2mm WT: 1-20mm Length: 1-12m
Manufacture
Tubes are made by electric-resistance welding.
Surface Condition
The finished tubes are free of scale., slight amount of oxidation is not considered as scale
Hardness Requirements
The tubes shall have a hardness number not exceeding 72HRB.
Thermal Treatment:
After welding, all tubes are heat treated at a temperature of 1200℉(650℃) or higher and following by cooling in air or in a cooling chamber of a controlled atmosphere furnace.
Cold drawn tubes shall be heat treated after the final cold-draw pass at a temperature of 1200℉(650℃) or higher
Test and Inspection
- Flattening Test
- Flange Test
- Reverse Test
- Hydrostatic or Nondestructive Electric Test

 

Tolerance for OD and WT (SA-450/SA-450M)

OD in (mm)
+
-
WT in (mm)
+
-
<1" (25.4)
0.10
0.10
≤1.1/2" (38.1)
20%
0
1"~1.1" (25.4-38.1)
0.15
0.15
≤1.1/2" (38.2)
20%
0
>1.1/2"~<2" (38.1-50.8)
0.20
0.20
 
 
 
2"~<2.1/2" (50.8-63.5)
0.25
0.25
 
 
 
2.1/2"~<3" (63.5-76.2)
0.30
0.30
 
 
 
3"~<4" (76.2-101.6)
0.38
0.38
 
 
 
4"~<7.1/2" (101.6-190.5)
0.38
0.64
 
 
 
>7.1/2"~9" (190.5-228.6)
0.38
1.14
 
 
 
 
Chemical Requirements
C
0.18
Mn
0.27 to 0.63
P
≤0.035
S
≤0.035
 

Production Show

TORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm LengthTORICH ASTM A214 ERW Carbon Steel Heat Exchanger Tubes 1000-1200 mm Length

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH ASTM A214 ERW Carbon Steel Heat-Exchanger and Condenser Tubes

Contact Details
TORICH INTERNATIONAL CO.,LTD

Contact Person: Jasmine Zhang

Send your inquiry directly to us (0 / 3000)