Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

EN10305-6 High Precision Welded Cold Drawn Tubes for Hydraulic and Pneumatic Power Systems

Minimum Order Quantity : 1ton Price : Negotiable
Packaging Details : Packed in wooden boxes or hexagonal bundles in seaworthy packing. Delivery Time : 30-45 work days
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 6000 Tons per Year
Place of Origin: ZHEJIANG, CHINA Brand Name: TORICH
Certification: ISO9001, ISO14001, TS16949 Model Number: EN10305-6

Detail Information

Product Name: EN10305-6 High Precision Welded Cold Drawn Tubes For Hydraulic And Pneumatic Power Systems Keyword: High Precision Welded Cold Drawn Tubes
Production Method: Cold Drawn On Weled Steel Tubes Grade: E155, E195, E235, E275, E355
Alloy Or Not: NON -alloy OD: 20mm-350mm
WT: 1mm-35mm Length: Max12000mm
High Light:

E355 Precision Steel Pipe

,

EN10305-2 Precision Steel Pipe

,

E235 Seamless Steel Pipes

Product Description

EN10305-6 High Precision Welded Cold Drawn Tubes for Hydraulic and Pneumatic Power Systems
 
Tube Manufacture
1.The tubes shall be manufactured from electric welded tubes by cold drawing. Other suitable methods of cold working are permitted.
The tubes shall be delivered in the delivery condition +N, which means that after final cold drawing (or other processing) the tubes
are normalized in a controlled atmosphere.
2.Welding shall be carried out by suitably qualified personnel according to suitable operating procedures. For tube to be used for
pressure equipment in categories II, III, and IV (of Directive 2014/68/EU), the operating procedures and the personnel shall be
approved by a competent third-party.
 
Products Description
Standard EN10305-6 Welded Cold Drawn Tubes
Key Word Precision Steel Tubes
Material E155, E195, E235, E275, E355
Size OD: 20-350mm; WT: 1-35mm; Length: max12000mm
Production method Cold Drawn
Deliver condition 1). +C No heat treatment after the final cold drawig process
2). +LC After the final heat treatment there is a suitable drawing pass
3). +SR After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere
4). +A After the final cold drawing process the tubes are annealed in a controlled atmosphere
5). +N After the final cold drawing operation the tubes are normalized in a controlled atmosphere

 

Chemical Components

Chemical composition (cast analysis)
steel grade % by max.
steel
name
steel
number
C
max.
Si
max.
Mn
max.
p
max.
S
max.
Al total a
min
.
E155 1.0033 0.11 0.35 0.70 0.025 0.015 0.015
E195 1.0034 0.15 0.35 0.70 0.025 0.015 0.015
E235 1.0308 0.17 0.35 1.20 0.025 0.015 0.015
E275 1.0225 0.21 0.35 1.40 0.025 0.015 0.015
E355 1.0580 0.22 0.55 1.60 0.025 0.015 0.020
Elements not quoted in this table (but see footnote a) shall not be intentionally added to the steel without the agreement of the purchaser, except for elements which may be added for the purposes of deoxidation and/or nitrogen binding. All appropriate measures shall be taken to prevent the addition of undesirable elements from scrap or other materials used in the steel making process.
a This requirement is not applicable provided the steel contains a sufficient amount of other nitrogen binding elements, such as Ti, Nb or V. If added, the content of these elements shall be reported in the inspection document.When using titanium, the manufacturer shall verify that (Al + Ti/2) 2 0,020.

 

Product Show of High Precision Welded Cold Drawn Tubes

High Precision Welded Cold Drawn TubesHigh Precision Welded Cold Drawn Tubes

 

Company Introduction

EN10305-6 High Precision Welded Cold Drawn Tubes for Hydraulic and Pneumatic Power Systems 2

EN10305-6 High Precision Welded Cold Drawn Tubes for Hydraulic and Pneumatic Power Systems 3EN10305-6 High Precision Welded Cold Drawn Tubes for Hydraulic and Pneumatic Power Systems 4

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

You Might Be Into These
Get in touch with us

Enter Your Message

sales6@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628