logo
Home > products > Precision Steel Tube >
EN10305-1 Precision Cold Drawn Steel Tube Seamless E355 E235 Steel Pipe

EN10305-1 Precision Cold Drawn Steel Tube Seamless E355 E235 Steel Pipe

High Pression Cold Drawn Steel Pipe

E355 Cold Drawn Steel Pipe

BKS Cold Drawn Steel Pipe

Place of Origin:

China

Brand Name:

TORICH

Certification:

ISO,CE

Model Number:

EN10305-1

Contact Us
Request A Quote
Product Details
Product Name:
EN10305-1 Precision Cold Drawn Steel Tube Seamless E355 E235 Steel Pipe
WT:
0.5-50mm
OD:
4-420mm
Length:
5.8m-11.8m
Standard:
EN10305-4
Usage:
Hydraulic And Pneumatic Power System
Shape:
Round Shape
Surface Finish:
Oiled
Highlight:

High Pression Cold Drawn Steel Pipe

,

E355 Cold Drawn Steel Pipe

,

BKS Cold Drawn Steel Pipe

Payment & Shipping Terms
Minimum Order Quantity
1 ton
Price
Negotiated
Packaging Details
Packing in hexagon with woven bags covered
Delivery Time
25-35 Days
Payment Terms
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability
250000 tons/year
Product Description

EN10305-1 Precision Cold Drawn Steel Tube Seamless E355 E235 Steel Pipe

 

TORICH is a professional supplier and exporter of precision seamless cold drawn steel tube with 20 years.

 

1.Brief introduction of Precision Cold Drawn Steel Tube:

Standard: EN10305-1

Size: 4mm-260mm

W.T.: 0.5mm-25mm

Shape: Round

Production type: Cold drawn or cold rolled

Length: Single random length/ Double random length or as customer’s actual request max length is 1.8m to fit container length.

Grade: E215, E235, E355

2.Delivery Conditions:

The tubes shall be manufactured from hot finished seamless tubes by cold drawing or other suitable processes.

The tubes shall be supplied in one of the delivery conditions as follows:

Designation Symbol Description
Cold drawn/hard +C No heat treatment after the final cold drawing process.
Cold drawn/soft +LC After the final heat treatment there is a suitable drawing pass.
Cold drawn and stress relieved +SR After the final cold drawing process there is a stress relief heat treatment in a controlled atmosphere.
Annealed +A After the final cold drawing process the tubes are annealed in a controlled atmosphere.
Normalized +N After the final cold drawing operation, the tubes are normalized in a controlled atmosphere.

3.Delivery Condition Symbol in accordance with EN10305 and DIN2391:

Symbol in accordance with EN 10305 Symbol in accordance with DIN2391
+C BK
+LC BKW
+SR BKS
+A GBK
+N NBK

4.Mechanical Properties:

Mechanical properties at room temperature
Steel Grade Minimum values for the delivery condition
Steel Name Steel Number +C +LC +SR +A +N
Rm

 

Mpa

A

 

%

Rm

 

Mpa

A

 

%

Rm

 

Mpa

ReH

 

Mpa

A

 

%

Rm

 

Mpa

A

 

%

Rm

 

Mpa

ReH

 

Mpa

A

 

%

E215 1.0212 430 8 380 12 380 280 16 280 30 290 to 430 25 30
E235 1.0308 480 6 420 10 420 350 16 315 25 340 to 480 235 25
E355 1.0580 640 4 580 7 580 450 10 450 22 490 to 630 355 22

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

5.Precision Cold Drawn Steel Tube Show:

EN10305-1 Precision Cold Drawn Steel Tube Seamless E355  E235 Steel Pipe 0EN10305-1 Precision Cold Drawn Steel Tube Seamless E355  E235 Steel Pipe 1

6.Packing method:

EN10305-1 Precision Cold Drawn Steel Tube Seamless E355  E235 Steel Pipe 2EN10305-1 Precision Cold Drawn Steel Tube Seamless E355  E235 Steel Pipe 3

7.A&Q

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

 

Send your inquiry directly to us

Privacy Policy China Good Quality Precision Steel Tube Supplier. Copyright © 2015-2025 TORICH INTERNATIONAL LIMITED . All Rights Reserved.