Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

API Carbon 0.3-3.5mm Thickness Precision Steel Tube

Minimum Order Quantity : 0.5 Ton Price : USD 1000-1500 Per Ton
Packaging Details : In bundles Delivery Time : 4-6 Weeks
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 500 Tons Per Month
Place of Origin: Zhejiang China Brand Name: TORICH
Certification: ISO 9001 Model Number: DIN2391

Detail Information

Sample: Free MOQ: 500 Kg
Standard: ASTM,DIN,GB,JIS,API Grade: 45#,20#,16Mn,10#,Q345
Thickness: 2 - 50 Mm,0.3-3.5mm,1 - 8 Mm Technique: Cold Drawn,Cold Rolled
Surface Treatment: Galvanized,customerized,Copper Coated,Null,polished Application: Hydraulic Pipe,Construction,Fluid Pipe,Oil Pipe
Alloy Or Not: Non-alloy Section Shape: Round
Type: Welded Or Seamless Tube Length: 6M Or As Requirement,As Customer's Require
High Light:

API precision steel tubing

,

3.5mm thickness precision steel tube

,

0.3mm thickness precision steel tube

Product Description

 

EN 10305-4 E235 (E255 E355 )+N Carbon Steel Pipe For Hydraulic And Pneumatic Systems

 

The surface of phosphating precision seamless steel pipe is especially suitable for painting or spray coating.
The paint surface has strong adhesion, excellent effect and beautiful ,anti rust effect Greatly strengthened.

 

 

 

Name

 

Scope mm DIN seriesmm
OD 04-30 ±0.08
OD 31-40 ±0.15
OD 41-50 ±0.20
OD 51-60 ±0.25
Wall 0.5-7 ±10%

 

 

 

Production Routing:


Quality carbon steel from bao steel etc big mill, cold drawing the heat treatment without oxidization , NBK condition. Do nondestructive testing ,

HT tests and do dipping oil antirust protection, Packed tube in wooden boxes.

 

 

Surface:

 

Galvanization/Galvanized/Zinc Coated

Blue White Zinc (Trivalent Chromium Passivation)

Plating Colour Zinc(Trivalent Chromium Passivation)

Yellow, Army-Green

Phosphated/Black Phosphated

 

 

Delivery Condition:

The tubes can be produced in the following delivery conditions: 

 

NBK

 

 

After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere

 

(+)N

 

After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere

 

 

BK (+C)

 

Cold finished/hard (cold finished as drawn).

No heat treatment after the last cold forming process.

 

BKW (+LC)

 

Cold finished/soft (lightly cold worked)

After the last heat treatment there is a light finishing pass (cold drawing).

 

BKS (+SR)

 

Cold finished/stress relieve annealed. 

After the final cold forming process the tubes are stress relieve annealed.

 

GBK (+A)

 

Annealed. 

After the final cold forming process the tubes are annealed in a controlled atmosphere.

 

 

Key words

 

Precision Steel Tubes

Precision Seamless Steel Tubes

Precision Welded Steel Tubes

Precision DOM Steel Tubes

High Precision Seamless Steel Tubes/Pipe

 

API Carbon 0.3-3.5mm Thickness Precision Steel Tube 0

API Carbon 0.3-3.5mm Thickness Precision Steel Tube 1

 

API Carbon 0.3-3.5mm Thickness Precision Steel Tube 2

 

 

 

 

 

 

 

 

 

 

 

 


hydraulicpump

hydraulicpumpparts

pistonpump

excavator

excavators

excavatorlife

constructionequipment

heavymachine

heavyequipment

Loader

miniexcavator

earthmoving

earthmovingequipment

earthmovingmachine

mixertruck

concretemixertruck

concretepump

You Might Be Into These
Get in touch with us

Enter Your Message

sales7@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628