JIS G3462 Seamless Steel Tube Carbon Alloy Steel For Boiler And Heat Exchanger Tubes
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 2Ton/Tons | Packaging Details : | Packaging: In bundles or in wooden boxes. |
---|---|---|---|
Delivery Time : | 20-40days | Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | : 60000 Ton/Tons per Year |
Place of Origin: | Zhejiang, China | Brand Name: | TORICH |
---|---|---|---|
Model Number: | Astm A519 |
Detail Information |
|||
Product Name: | Oval Shaped Steel Tubes | Standard: | Astm A519 |
---|---|---|---|
Material: | Carbon Steel | OD: | 15 - 200 Mm Mm |
WT: | 0.8 - 16 Mm Mm | Surface Treatment: | Oiled |
Technique: | Cold Drawn | Usage: | Boiler Pipe, Hydraulic/Automobile Pipe |
High Light: | WT 0.8MM Seamless Steel Tube,Astm A519 Seamless Steel Tube,Astm A519 Oval Steel Tube |
Product Description
ASTM A519 Oval Shaped Steel Tubes
|
Torich's Chemical assurance
1. Each lot of raw materials will be tested by spectrometer before put in storage.
2. 100%PMI the mother pipe to ensure we put right material.
2. 100%PMI the finished pipe again to ensure we produced right grade
Heat Treatment Assurance
A full-automatic natural gas furnace with 24 meters in length.The real temperature
tolerance could be within 10℃.
Keywords: Oval Shaped Tubes, Steel Oval Tube, Carbon Steel Oval Tube
Company Introduction
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
TORICH EN10305-6 E235 E355 Welded Cold Drawn Tubes
Enter Your Message