Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

High Precision Seamless Cold Drawn DIN 2391 ST35 ST45 ST52 Steel Hydraulic Pipe

Minimum Order Quantity : 5 tons Price : Negotiable
Packaging Details : in bundles with seaworthy packing Delivery Time : 45-60 days
Payment Terms : T/T, L/C, D/A, D/P, Western Union, MoneyGram Supply Ability : 6000 ton/year
Place of Origin: CHINA Brand Name: TORICH
Model Number: DIN2391-1

Detail Information

Certification: ISO9001, TS16949 Product Name: High Precision Seamless Cold Drawn DIN 2391 ST35 ST45 ST52 Steel Hydraulic Pipe
Special Tube: Precision Seamless Steel Tube Standard: DIN 2391-1
Technique: Cold Drawn Section Shape: Round
Alloy Or Not: Non-alloy Secondary Or Not: Non-secondary
High Light:

E235 Steel Hydraulic Pipe

,

EN10305 Steel Hydraulic Pipe

,

ASTM A519 Cold Rolled Pipe

Product Description

High Precision Seamless Cold Drawn DIN 2391 ST35 ST45 ST52 Steel Hydraulic Pipe

 

1. Quick Overview:

Standard: EN10305-1, EN10305-4, DIN2391,
Material: E235, E355, ST37.0, ST44.0, ST52.0

Chemical composition:

Standard Steel Grade C(%) Si(%) Mn(%) S(%) P(%)
DIN 2391 St35 ≤0.17 ≤0.35 ≥0.40 ≤0.025 ≤0.025
St37 ≤0.17 ≤0.35 ≥0.40 ≤0.025 ≤0.025
St37.4 ≤0.17 ≤0.35 ≥0.40 ≤0.025 ≤0.025
St45 ≤0.21 ≤0.35 ≥0.40 ≤0.025 ≤0.025
St44 ≤0.21 ≤0.35 ≥0.40 ≤0.025 ≤0.025
St52 ≤0.22 ≤0.35 ≥1.60 ≤0.025 ≤0.025

 

2. Main Features:

Bright black color is homogeneously distributed on the tube surface. The tube has good property of antirust.


3. Main Application:

For auto industry, machinery use, oil cylinder, motorcycle shock absorber.

 

4. Production process:
DIN series tubes, cold drawn and bright annealed precision seamless steel tube is used as the tube to be phosphated.

The phosphorization is realized with the imported chemical fluid to form a black film.

The antirust oil is absorbed by means of the micropore on the film to prevent the tubes from getting rust.


5. Our products are widely used in:
Engineering machinery Machine tool industry Hydraulic industry Special vehicle
Automobile pipeline Heavy machinery Compressor Shipbuilding industry
Railway locomotive Diesel engine Utility boiler Injection molding machine
Power equipment Heavy duty automobile Forging and stamping machine

 

6. Delivery Conditions:

The tubes shall be manufactured from hot finished seamless tubes by cold drawing or other suitable processes.

The tubes shall be supplied in one of the delivery conditions as follows:

Designation Symbol Description
Cold drawn/hard +C No heat treatment after the final cold drawing process.
Cold drawn/soft +LC After the final heat treatment there is a suitable drawing pass.
Cold drawn and stress relieved +SR After the final cold drawing process there is a stress relief heat treatment in a controlled atmosphere.
Annealed +A After the final cold drawing process the tubes are annealed in a controlled atmosphere.
Normalized +N After the final cold drawing operation, the tubes are normalized in a controlled atmosphere.
 

 

Product Display of High Precision Seamless Cold Drawn Hydraulic Pipe

High Precision Seamless Cold Drawn DIN 2391 ST35 ST45 ST52 Steel Hydraulic PipeHigh Precision Seamless Cold Drawn DIN 2391 ST35 ST45 ST52 Steel Hydraulic Pipe

 

Manufacturing Process

High Precision Seamless Cold Drawn DIN 2391 ST35 ST45 ST52 Steel Hydraulic Pipe 2

Packing & Delivery

Packing Details : In bundles or in wooden boxes packaging

Delivery Details : 30-60days

Hydraulic System Black Phosphated And Oiled Steel Pipe

TORICH-Packing and delivery
 
Our Certifications
TORICH-Certificates
 
FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


If you have another question, pls feel free to contact us.

You Might Be Into These
Get in touch with us

Enter Your Message

sales6@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628