Home ProductsSeamless Steel Tube

Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube

China TORICH INTERNATIONAL CO.,LTD certification
China TORICH INTERNATIONAL CO.,LTD certification
Dear Richard, thks for your continous support to our company, we have faith in your company's product and services

—— Cassy

you always commit and manage to meet our very tight tolerence requirement,furthermore Torich International never fail our delivery.

—— Cassy

This is what we are looking for, a reliable and responsible supplier.

—— Cassy

I'm Online Chat Now

Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube

China Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube supplier
Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube supplier Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube supplier Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube supplier Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube supplier

Large Image :  Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube

Product Details:

Place of Origin: China
Brand Name: Torich
Certification: CE,ISO
Model Number: EN10305

Payment & Shipping Terms:

Minimum Order Quantity: 5 tons
Packaging Details: Packing in bundle in boxes
Delivery Time: 40-45 days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 35 t0ns per month
Contact Now
Detailed Product Description
Name: EN10305 E235 E355 Seamless Precision Cold Drawn Steel Pipe Standard: EN10305
Manufacturing: Cold Drawn Grade: E215,E235,E355,etc
High Light:

seamless steel pipe

,

precision stainless steel tubing

Torich EN10305 E235 E355 Seamless Precision Cold drawn Steel Pipe
 

Brief introduction:

NameEN10305 Seamless Precision Cold drawn Steel Pipe
StandardEN10305
Production methodCold drawn
GradeE215,E235,E355,etc
Section shapeRound
OD5-420mm
WT0.5-50mm
Lengthmax12000mm
Delivery condition+C Cold drawn /hard No heat treatment after final cold drawing
+LC Cold drawn /soft Proper drawing after final heat treatment
+SR Cold drawn and stress relieved After the final cold drawing process, the stress relief heat treatment is carried out under the control atmosphere
+A Annealed Annealing heat treatment in controlled atmosphere after final cold drawing
+N Normalizing Normalizing heat treatment in controlled atmosphere after final cold drawing

 

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc

8. Packing and Stocking

Product show:

Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube 0Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube 1Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube 2

Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube 3Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube 4Cold Drawn EN10305 E235 E355 Precision Applications Seamless Steel Tube 5

 

Q&A

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

 

Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.

 

Q: How is your production capability?
A: 1. 2000 tons monthly production capacity, 5000 tons monthly trading capability
2. Prompt and Timely shipment

Q:How to get the sample?
A:1. You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2. Sample charges will be refunded when order is placed.

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

Contact Details
TORICH INTERNATIONAL CO.,LTD

Contact Person: Christine Guan

Tel: +8618958207675

Send your inquiry directly to us (0 / 3000)