Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber

Minimum Order Quantity : 2 tons Price : 888 USD PER TON
Packaging Details : packing in standard seaworthy package Delivery Time : 20-30 days
Payment Terms : T/T, L/C, D/A, D/P, Western Union, MoneyGram Supply Ability : 5000 tons per month
Place of Origin: Zhejiang,CN Brand Name: TORICH
Certification: ISO9001 ISO14001 TS16949 Model Number: DIN2391

Detail Information

Keyword: Precision Steel Tubes Material: 1008,1010,1020,ST37,E235
Technique: CDS OD: 5-420mm
WT: 0.5-50mm Country Of Origin: Zhejiang,CN
High Light:

precision steel pipe

,

precision seamless pipe

Product Description

Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber

TORICH is a professional steel tubes supplier from China with over 23 years manufacturing and exporting experience.
Our main products are seamless precision pipe,carbon steel seamless precision pipe,alloy steel seamless precision pipe, stainless steel seamless precision pipe.The material we usually use for producing Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber  is10#,20#,1010,1020,1026,ST37,ST44,E235,E215,E355
 

Chemical Composition and Mechanical Performance:

Table 1- Chemical composition
Steel Grade C% Si% Mn% P% S% AL%
E215 ≤0.10 ≤0.05 ≤0.7 ≤0.025 ≤0.025 ≥0.025
E235 ≤0.17 ≤0.35 0.4-1.2 ≤0.025 ≤0.025  
E255 ≤0.21 ≤0.35 0.4-1.1 ≤0.025 ≤0.025  
E355 ≤0.22 ≤0.55 ≤1.6 ≤0.025 ≤0.025  

 

Table 2 - Mechanical properties at room temperature
Delivery Condition BK BKW GBK NBK (N)
Steel Grade Rm A % Rm A % Rm A % Rm ReH A %
Mpa (Min) (Min) Mpa(Min) (Min) Mpa(Min) (Min) Mpa(Min) Mpa(Min) (Min)
E215 430 8 380 12 280 30 290~430 215 30
E235 480 6 420 10 315 25 340~480 235 25
E255 580 5 520 8 390 21 440~570 255 21
E355 640 4 580 7 450 22 490~630 355 22

 

Other Specification:

End Shape

Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's

requirements

Surface

Treatment

Oiled, Galvanized, Phosphate etc
Technique Cold drawn & cold rolled
Application 1. Automotive and mechanical pipes
2. Petroleum cracking pipes
3. High Pressure Boiler Pipe
4. Low and middle pressure fluid transportation pipeline
5. Chemical fertilizer equipment pipes
6. Heat exchanger pipes

Delivery

Conditions

1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N)

After the final cold forming process the tubes are annealed above the upper transformation

point in a controlled atmosphere.

Package 1. Bundle Packing.
2. Plain end or vanished as per customer's request.
3. Wrapped in waterproof paper.
4. Sackcloth with several steel strips.
5. Pack in heavy tri-wall boxes.

 

Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 0Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 1Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 2

Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 3Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 4Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 5Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 6Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 7

Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 8Seamless Precision Steel Tube for Motorcycle and Automotive Shock Absorber 9

FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

You Might Be Into These
Get in touch with us

Enter Your Message

sales10@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628