Send Message

Astm A519 Special Steel Pipe Seamless Cold Formed Hollow Elliptical Oval Steel Tube

Product Details:
Place of Origin: ZHEJIANG, CHINA
Brand Name: TORICH
Certification: ISO9001, ISO14001, TS16949
Model Number: ASTM A519
Payment & Shipping Terms:
Minimum Order Quantity: 5 Tons
Packaging Details: In wooden boxes with seaworthy packing.
Delivery Time: 30-45 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 5000 Tons per Year

Detail Information

Keyword: Elliptical Steel Tube Material: 10#.20#.ST35-ST52 Etc
OD: 5-420 Mm WT: 0.3-50 Mm
Length: Max12000mm Usage: Agricultural Machines , Structural Construction
Delivery Condition: +C, +A Type: Seamless Cold-Drawn
High Light:

alloy steel seamless pipe

,

rectangular steel pipe

Product Description

TORICH ASTM A519 Seamless Cold Formed Hollow Elliptical Steel Tube

 

Quick Detail:  
Material: 10#-45# A53-A369, ST35-ST52, Q195, Q235 , Q345
Grade: BS, JIS, GB, DIN, ASTM, API,
Shape: oval
Wall thickness: 0.5-50mm
Length: up to 12m, or according to customer's requirement.
Outer diameter: Round: 5-420mm
  Diameter and wall thickness could be at customer's request.
   
Technology: Cold Draw/Cold Rolled
Surface treatment: painted,galvanized,or oiled according to customer's requirement
Application: Lighting,furniture,medical equipments
Place of origin: China
Application Mechanical engineering , Agricultural machines , Structural construction

 

Shipping & Payment:  
Packaging: In bundles; or according to customer's requirements
MOQ: 5 MT
Terms of Delivery : FOB Shanghai
Terms of Parment : T/T, 30% advance payment, balance paid against B/L copy
Delivery time: Within 25-40 days since advance payment is receied

 

Torich's Chemical assurance
1. Each lot of raw materials will be tested by spectrometer before put in storage.
2. 100%PMI the mother pipe to ensure we put right material.
2. 100%PMI the finished pipe again to ensure we produced right grade

Heat Treatment Assurance
A full-automatic natural gas furnace with 24 meters in length.The real temperature

tolerance could be within 10℃.

 

Product pictures:

Astm A519 Special Steel Pipe Seamless Cold Formed Hollow Elliptical Oval Steel Tube 0

Astm A519 Special Steel Pipe Seamless Cold Formed Hollow Elliptical Oval Steel Tube 1

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

PACKING:
Each tube in a plastic bag, then put tubes in a seaworthy woven bag ,each unit weight 400kg-500kg/bundle.
With strong wood structure box packing by containers loading and shipping.
Or as customer's requirement.
20 ft container - GP: 5.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 25MT/container.
40 ft container - GP: 11.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 27MT/container.
40 ft container - HG: 11.8m (Length) * 2.13m (Width) * 2.72m (Height) ------ Max Gross Weight: 27MT/container.
Port Shanghai

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

Get in touch with us

Enter Your Message

You Might Be Into These
sales9@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628