Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

GM123M GM124M Welded Steel Tube Double Wall Brake Tube Excellent Corrosion Resistance

Minimum Order Quantity : 5Tons Price : USD1000-1500
Packaging Details : Packing: antirust protection, In hexagon bundles, in wooden box Delivery Time : 45-50 work days
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 3000 Tons per Month
Place of Origin: Zhejiang, China (Mainland) Brand Name: TORICH
Certification: ISO9001 Model Number: GM123M

Detail Information

Key Words: Double Wall Bundy Tube Material: Low Carbon Steel, Such As SPCC BLD BLC
Standard: GM123M, GM124M, TS7600G, GB 11258-89 OD: 4.76-12mm
WT: 0.7-1mm Coating: Copper/Zinc/PVF/Military Green Zinc/GALFAN/Nylon
Application: Brake Tube On Automobile
High Light:

welded steel pipe

,

electric resistance welded steel tube

Product Description

TORICH GM123M GM124M Galvanized Double Wall Bundy Tube With Zinc Coating For Automobile Brake

1. Standard

            GM123M, GM124M, TS7600G, GB 11258-89

 

2. Steel Grade/Steel Material/Steel Number:

            Low carbon steel, such as SPCC BLD BLC

 

3. Raw Material:

           Cold rolled low carbon steel strip

 

4. Characteristic:

           Good Surface Quality, Uniform coating

           No coating burr

           Stable quality

           Excellent corrosion resistance

           TORICH QUALITY ASSURANCE

 

5. Application: Brake tube on automobile

 

6. Specifications:

OD(mm) OD tolerance(mm) WT(mm) WT tolerance(mm) Coil length

4.76

(3/16”)

+/-0.10 or as per customer’s requirement 0.7 +/-0.07 600-1000m/coil
6
6.35

8

(5/16”)

9.5

(3/8”)

10

11.1

(7/16”)

12

12.7

(1/2”)

8 1 +/-0.1
10
12

 

7. Mechanical properties:

Tensile Stregth (min) 270MPa
Yield Stregth (min) 180 MPa
Elongation (min) 14%

 

8. Coating:

Type Thickness Salt spray test time
White zinc coating 8μm 72h
Color zinc coating 8μm 72h
Olive green coating 8μm 180h
PVF coating white zinc 8μm + PVF 20μm 1000h
Nylon coating white zinc 8μm + nylon 40μm 10000h

 

9. Packing: In coil, in wooden box with seaworthy packing

 

Detailed Images

 

GM123M GM124M Welded Steel Tube Double Wall Brake Tube Excellent Corrosion Resistance 0

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

 

A&Q

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

You Might Be Into These
Get in touch with us

Enter Your Message

sales9@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628