ERW 3PE FBE Epoxy Plastic Coated Spiral Steel Pipe
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5Tons | Price : | USD600-900/ton |
---|---|---|---|
Packaging Details : | Structural Steel Pipes are packed in wooden boxes or hexagonal bundles in seaworthy packing. | Delivery Time : | 30-45 work days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 5000Tons per Year |
Place of Origin: | ZHEJIANG, CHINA | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO9001, ISO14001, TS16949 | Model Number: | JIS G 3452 |
Detail Information |
|||
Keyword: | Structural Steel Pipe | Material: | SGP Carbon Steel |
---|---|---|---|
OD: | 5 - 420 Mm | WT: | 0.5 - 50 Mm |
Length: | Max 12000mm | Usage: | For Ordinary Piping |
Sureface: | Zinc Coating | Relevant Standard: | KS D3507, ASTM A53, API 5L, DIN 2440 |
High Light: | cold formed steel tube,structural steel square tubing |
Product Description
Standard
|
JIS G 3452 JIS G 3452 Carbon steel pipes for ordinary piping
|
Relevant Standard
|
KS D3507, ASTM A53, API 5L, DIN 2440, DIN2441, BS 1387, BS 3601
|
Material
|
SGP Carbon Steel
|
Size
|
WT: 0.5-50mm; OD: 5-420mm; Length: max 12000mm
|
Sureface
|
Black pipe without zinc coating
Galvanized pipe with zinc coating |
Applications
|
For Ordinary Piping
|
Test
|
Tension Test, Flaring Test, Flange Test,
Reverse Test, Hardness Test, Hydrostatic or Nondestructive Electric Test etc |
Chemical Composition
Steel grade
|
P
|
S
|
SGP
|
0.040max
|
0.040max
|
Mechanical Properties
Steel Grade
|
Tensile Strength Mpa
|
Elongation %
|
SGP
|
290 min
|
30 min
|
Demensional Tolerances
Nominal Diameter
|
OD (mm)
|
OD Tolerances
|
WT (mm)
|
WT Tolerances
|
||
A
|
B
|
Pipes to be cut in taper thread
|
Other pipes
|
|||
6
|
1/8
|
10.5
|
±0.5mm
|
±0.5mm
|
2.0
|
+Not specified
-12.5%
|
8
|
1/4
|
13.8
|
±0.5mm
|
±0.5mm
|
2.3
|
|
10
|
3/8
|
17.3
|
±0.5mm
|
±0.5mm
|
2.3
|
|
15
|
1/2
|
21.7
|
±0.5mm
|
±0.5mm
|
2.8
|
|
20
|
3/4
|
27.2
|
±0.5mm
|
±0.5mm
|
2.8
|
|
25
|
1
|
34.0
|
±0.5mm
|
±0.5mm
|
3.2
|
|
32
|
1 1/4
|
42.7
|
±0.5mm
|
±0.5mm
|
3.5
|
|
40
|
1 1/2
|
48.6
|
±0.5mm
|
±0.5mm
|
3.5
|
|
50
|
2
|
60.5
|
±0.5mm
|
±1%
|
3.8
|
|
65
|
2 1/2
|
76.3
|
±0.7mm
|
±1%
|
4.2
|
|
80
|
3
|
89.1
|
±0.8mm
|
±1%
|
4.2
|
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
PACKING:
Each tube in a plastic bag, then put tubes in a seaworthy woven bag ,each unit weight 400kg-500kg/bundle.
With strong wood structure box packing by containers loading and shipping.
Or as customer's requirement.
20 ft container - GP: 5.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 25MT/container.
40 ft container - GP: 11.8m (Length) * 2.13m (Width) * 2.18m (Height) ------ Max Gross Weight: 27MT/container.
40 ft container - HG: 11.8m (Length) * 2.13m (Width) * 2.72m (Height) ------ Max Gross Weight: 27MT/container.
Port Shanghai
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Enter Your Message