Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

Professional Alloy Steel Seamless Pipes For Boiler And Superheater

Minimum Order Quantity : 5Tons Price : negotiable
Packaging Details : Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing. Delivery Time : 30-45 work days
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 2000Tons per Year
Place of Origin: ZHEJIANG, CHINA Brand Name: TORICH
Certification: ISO9001, ISO14001, TS16949 Model Number: ASTM A209

Detail Information

Keyword: Alloy Steel Tubes Standard: ASTM A209
Material: T1 T1a T1b OD: 6 - 420 Mm
WT: 1 - 50 Mm Length: Customer Requirement
Usage: Boilers/Superheaters End Protector: Plain
High Light:

alloy steel seamless tube

,

seamless alloy steel pipe

Product Description

Products Description
 
TORICH ASTM A209 T1 T1a T1b Seamless Alloy Steel Tubes For Boiler and Superheater Tube
Standard
ASTM A209
Matrial
T1 T1a T1b
Size
OD: 6-420mm WT: 1-50mm Length: according to customer requirement
Application
For Boilers,Superheaters, Heat-Exchangers, High-pressure Boilers
Manufacture
Tubes are made by seamless process.
At the manufacturer's option, tubing may be furnished either hot finished or cold finished.
Test and Inspection
Mechanical Test, Tension Test
Flaring Test, Flattening Test
Hardness Test, Hydrostatic or Nondestructive Electric Test
 
Chemical Composition
Element
T1
T1a
T1b
Carbon
0.10-0.20
0.15-0.25
0.14 max
Manganese
0.30-0.80
0.30-0.80
0.30-0.80
Phosphorus
0.025
0.025
0.025
Sulfur max
0.025
0.025
0.025
Silicon
0.10-0.50
0.10-0.50
0.10-0.50
Molybdenum
0.44-0.65
0.44-0.65
0.44-0.65
 
Mechanical Properties
Element
T1
T1a
T1b
Tensile Strength min Mpa
380
365
415
Yield Strength min Mpa
205
195
220
Elongation min %
30
30
30
 

Production Show

Professional Alloy Steel Seamless Pipes For Boiler And Superheater 0Professional Alloy Steel Seamless Pipes For Boiler And Superheater 1

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH ASTM A209 T1 T1a T1b Seamless Alloy Steel Tubes For Boiler and Superheater Tube

You Might Be Into These
Get in touch with us

Enter Your Message

sales9@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628