Send Message
Contact Us

Contact Person : Richard SHEN

Phone Number : +86-13736164628

WhatsApp : +8613736164628

Free call

Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building

Minimum Order Quantity : 1Tons Price : negotiable
Packaging Details : Stainless Steel Tubes are packed in bundles in seaworthy packing. Delivery Time : 50-60 work days
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability : 2000Tons per Year
Place of Origin: ZHEJIANG, CHINA Brand Name: TORICH
Certification: ISO9001, ISO14001, TS16949 Model Number: ASTM A789

Detail Information

Keyword: Duplex Stainless Steel Pipe Standard: ASTM A789
Material: S32750, S31803, S32760, S32205 Surface: Pickling
OD: 6-530 Mm WT: 1-30 Mm
Length: Max 15 M Usage: Petrochemical, Nuclear Power And Boiler Etc
High Light:

stainless steel round tube

,

stainless tube steel

Product Description

Products Description
 
TORICH ASTM A789 Seamless Duplex Stainless Steel Pipe for Ship building
Product Name
Seamless Duplex Stainless Steel Pipe for Ship building
Standard
ASTM A789, A312, A790, GB/T13296, GB/T14976
Size
OD: 6-530 mm WT: 1-30 mm Length : max 15m
Type
Seamless and Welded
Material
S32750, S31803, S32760, S32205
Application
Petrochemical, Nuclear power and Boiler etc

 

Chemical Composition

Steel Grade
C
Mn
Si
S
P
Cr
Ni
Mo      Cu
N
S32750(SAF2507)
00Cr25Ni7Mo4N
≤0.03
≤1.20
≤0.80
≤0.020
≤0.035
24.0-26.0
6.0-8.0
3.0-5.0 ≤0.50
0.24-0.32
S31803/S32205
(SAF2205)
00Cr22Ni5Mo3N
≤0.03
≤2.00
≤1.0
≤0.02
≤0.030
21.0-23.0
4.5-6.5
 2.5-3.5
0.08-0.20
S31500(3RE60)
00Cr18Ni5Mo3Si2
≤0.03
1.2-2.0
1.4-2.0
≤0.030
≤0.030
18.0-19.0
4.25-5.25
 2.5-3.0
0.05-0.10

 

Mechaniacl Properties

Steel Grade
Heat Treating
Tensile Strength
Mpa
Yeild Strength
Mpa
Elongation %
Hardness
Brinell Rockwell
S32750(SAF2507)
00Cr25Ni7Mo4N
1025-1125℃
water cooling
≥800
≥550
≥15
≤310
≤32
S31803/S32205
(SAF2205)
00Cr22Ni5Mo3N
1020-1100℃
water cooling
≥620
≥450
≥25
≤290
≤30.5
S31500(3RE60)
00Cr18Ni5Mo3Si2
980-1040℃
water cooling
≥630
≥440
≥30
≤290
≤30.5

 

Process Flow

Round Bar →Peeling →Heating →Piercing →Raw Pipe →Pickling Straightening →

Annealing →Grinding →Cold Drawing/Rolled →Lubricating →End Preparation

→Pickling →Cut to length →Testing →Seamless Pipe →Packing →Product Storage

 

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

 

Products Show

Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building 0Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building 1
 
Packing & Delivery
Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building 2Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building 3
 
Our Certifications
Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building 4Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building 5Torich Duplex Stainless Steel Tube Astm A789 Seamless For Ship Building 6
 
 
FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us

TORICH ASTM A789 Seamless Duplex Stainless Steel Pipe for Ship building

You Might Be Into These
Get in touch with us

Enter Your Message

sales9@steel-tubes.com
+8613736164628
+8613736164628
torichinternational
+86-13736164628
torichinternational@yahoo.com
174524687
174524687
+86-13736164628