Home ProductsDOM Steel TubeElectric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished
Good quality DOM Steel Tube for sales
Good quality DOM Steel Tube for sales
Dear Richard, thks for your continous support to our company, we have faith in your company's product and services

—— Cassy

you always commit and manage to meet our very tight tolerence requirement,furthermore Torich International never fail our delivery.

—— Cassy

This is what we are looking for, a reliable and responsible supplier.

—— Cassy

I'm Online Chat Now

Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished

China Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished supplier
Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished supplier Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished supplier Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished supplier Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished supplier

Large Image :  Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished

Product Details:

Place of Origin: ZHEJIANG, CHINA
Brand Name: TORICH
Certification: ISO9001, ISO14001, TS16949
Model Number: BS6323-6

Payment & Shipping Terms:

Minimum Order Quantity: 5Tons
Price: USD600-1200Tons
Packaging Details: DOM Steel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing
Delivery Time: 30-45 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 2000Tons per Year
Contact Now
Detailed Product Description
Keyword: DOM STEEL TUBE Standard: BS6323-6
Grade: CEW1a CEW2a CEW3a CEW4a CEW5a Surface: Oiled
Shape: Round Technique: ERW
OD: 6-350mm WT: 1-35mm
Length: Max 12000mm Application: Auto Industry

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube

 

Product Description:

Standard: BS6323-6

Size Range: OD: 6-350mm
WT: 1-35mm

Length: max 12000mm

Steel Grade: CEW1a CEW2a CEW3a CEW4a CEW5a

Delivery Condition:

1 BK Cold finished(hard)

2 BKW Cold finished(soft)

3 GBK Annealed

4 NBK Normalized

5 GZF Annealed (including de-scaling)

6 NZF Normalized (including de-scaling)

 

Product Pictures:

Electric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold FinishedElectric Resistance Welded Drawn Over Mandrel Steel Tubing With Cold Finished

 

Packing:

 

Characteristic:

Good concentricity

Good OD and ID tolerance

High precision

Stable quality

Smooth roughness

 

DOM Steel Tube Production Process:

Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage

 

Torich's Chemical assurance
1.Each lot of raw materials will be tested by spectrometer before put in storage.
2.100%PMI the mother pipe to ensure we put right material.
2.100%PMI the finished pipe again to ensure we produced right grade

Heat Treatment Assurance

A full-automatic natural gas furnace with 24 meters in length.The real temperature tolerance could be within 10℃.

 

FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us

TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube

Contact Details
TORICH INTERNATIONAL CO.,LTD

Contact Person: Jasmine Zhang

Send your inquiry directly to us (0 / 3000)