DIN 2393 St37-2 Welded Steel Tube Precision Cold Drawn Welded Steel Pipe For Sleeve
Product Details:
|
|
Place of Origin: | ZHEJIANG, CHINA |
---|---|
Brand Name: | TORICH |
Certification: | ISO9001, ISO14001, TS16949 |
Model Number: | DIN30670 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 5Tons |
Price: | USD4500-5500/Ton |
Packaging Details: | SSAW Steel Pipe packed in wooden boxes or hexagonal bundles in seaworthy packing. |
Delivery Time: | 15-45 work days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | USD400000Tons |
Detail Information |
|||
Standard: | DIN30670, DIN30671, AWWAC210, CECS10-89, Q/CNPC38 2016, SY/T0414, SY/T0315, SY/T0447, SY/T0413, CJ/T114, CJ/T120, SY/T5037-2012, GB/T9711-2017 | Surface: | FBE, 2PE, 3PE, 2PP Coating |
---|---|---|---|
Material: | Q235B,16Mn, X42- X80 | Shape: | Round Shape |
OD: | 219-3200mm | WT: | 6-28mm |
Length: | 21.5m Max | Usage: | Gas Pipe, Oil Pipe, Chemical Pipe |
High Light: | welded steel pipe,electric resistance welded steel tube |
Product Description
Standard: GB/T13793,GB/8713,GB/3693,GB/T6728,DIN2393/2394,ASTM-A513,JIS-G3445, EN-10305-2,EN-10305-3,EN-10305-5
Material: Q195,Q215,Q235,Q295,Q345,SPCC/SPHC, ST12(DC01), ST-2G/2, B340/590DP, B400/780DP, B340LA, SS400, Q195, Q235B, Q345B, SAPH370, SAPH400, SAPH440, QSte420TM, QSte460TM, BR1500HS/22MnB5
Standard: DIN30670, DIN30671, AWWAC210, CECS10-89, Q/CNPC38 2016, SY/T0414, SY/T0315, SY/T0447, SY/T0413, CJ/T114, CJ/T120, SY/T5037-2012, GB/T9711-2017
Size range: OD: 219-3200mm
WT: 6-28mm
Length: max 21.5m
Material: Q235AB,16Mn,x42-x80
Size |
Coating thickness min(mm) (n) |
≤DN100 | 1.8 |
DN100-DN250(DN250) | 2.0 |
DN250-DN500 | 2.2 |
DN500(DN500)-DN800 | 2.5 |
≥DN800 | 3.0 |
Characteristic:
Good concentricity High Precision
Good surface quality Stable quality
Good OD and ID tolerance Smooth Roughness
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us
Enter Your Message